Harris Gates Crossing Gets Proposed Road-Over-Rail Bridge
Transport for NSW has put a 104-meter bridge plan on public display, with feedback open until 11 December.
Updated on Nov. 16, 2026 in Australia and New Zealand

Live Poll
Do you trust local government to deliver safer road and rail crossings in your area?
Transport for NSW has put on display a plan to replace the Harris Gates level crossing on the Olympic Highway with a 104-meter road-over-rail bridge. The project is part of a joint Australian and NSW government investment of A$350 million to grade-separate the Harris Gates and Tichborne crossings.
Why it matters
The Harris Gates crossing is being prioritised to improve road and rail safety and to accommodate double-stacked trains on the Inland Rail route. Residents across New South Wales who travel the Olympic Highway or rely on freight corridors may be affected by the realignment and construction works.
The proposed bridge would be about 104 metres long and 15 metres wide, with one lane in each direction and approach embankments up to 10 metres high. About 3.4 kilometres of the Olympic Highway and 300 metres of Warrens Lane would be realigned, and the final design remains open to feedback until 11 December.
The players
Transport for NSW
The New South Wales state agency responsible for planning and managing the state's transport network, including road and rail infrastructure projects.
The details
The existing Harris Gates crossing would be removed and traffic carried over the railway on the new bridge. The site lies about 2 kilometres northeast of Illabo in southern New South Wales, where the Olympic Highway crosses the ARTC Main Southern railway line.
Timeline
February 2025: Early investigations announced, with A$280 million federal and A$70 million NSW funding committed.
25 November 2026: Drop-in consultation sessions at Farm House Illabo and Junee Library.
30 November 2026: Online Microsoft Teams consultation session.
11 December 2026: Feedback period closes; a Submissions Report will follow.
Market Landscape
The Harris Gates project is one of two Inland Rail crossings prioritised for grade separation, extending the freight corridor's upgrade programme across New South Wales. It follows the wider federal commitment of A$450 million for Inland Rail road interfaces statewide.
Drivers on the Olympic Highway near Illabo should expect realignment works and possible traffic changes during construction. Residents can comment through the online form, interactive map, email, post or the November and December consultation sessions before the 11 December deadline.
The takeaway
Community input closes on 11 December, so anyone affected by the Olympic Highway or nearby freight movements has a short window to have a say on the final design.
What happens next
Feedback on the Harris Gates plan closes on 11 December 2026, after which Transport for NSW will publish a Submissions Report and a Consultation Report. The Tichborne review and concept design are expected to go on display in mid-2027.
Further reading
For more on the region's roads and rail, explore Australia and New Zealand travel coverage.
Source note: This article includes information reported by Railway Supply.
Live Poll
Do you trust local government to deliver safer road and rail crossings in your area?






