Viettel-Singtel Consortium Begins Vietnam-Singapore Subsea Cable
The 2,500km VTS cable system links Vietnam, Thailand and Singapore, with construction contracts signed with NEC Corporation and Asean Cableship.
Updated on Nov. 26, 2026 in Telecommunications

Live Poll
Do you think Vietnam's internet and banking services are getting more reliable?
A Viettel-Singtel consortium has begun construction of a submarine fibre-optic cable connecting Vietnam, Thailand and Singapore, with a design capacity of 600 Tbps across 2,500km. NEC Corporation and Asean Cableship were signed as project contractors.
Why it matters
The project is the first international submarine cable initiated and led by a Vietnamese enterprise, giving Vietnam an additional international route to reduce reliance on existing routes. It is intended to keep the country's digital economy less exposed to factors beyond its control.
The cable system has a design capacity of 600 Tbps over 2,500km, with the Singapore-Vietnam segment covering about 1,200km at 240 Tbps. Expected round-trip latency between the two countries is 12 milliseconds, roughly 50% lower than existing routes, though these are projections rather than measured results.
The players
Viettel Group
Viettel Group is Vietnam's state-owned military-linked telecommunications conglomerate and a major operator of domestic and international networks.
Singtel
Singtel is a Singapore-headquartered telecommunications company with major regional operations across Asia and Australia.
NEC Corporation
NEC Corporation is a Japanese multinational information technology and telecommunications company that builds submarine cable systems.
Asean Cableship
Asean Cableship is a regional marine cable-laying company that performs installation work for submarine telecommunications cables.
The details
Viettel directly led the route planning and design, including landing points, system configuration and overall performance, while the Viettel-Singtel consortium VTS is co-chaired by Viettel Group and Singtel. The project builds on a memorandum of understanding signed in April 2024, and the contracts were signed at an event in Ho Chi Minh City on November 26.
Timeline
April 2024: Viettel and Singtel signed a memorandum of understanding for the cable.
November 26, 2026: Construction began and contracts were signed in Ho Chi Minh City.
Fourth quarter 2030: The cable system is expected to be completed.
The Tech Race
Submarine cable capacity across Southeast Asia has been expanding as regional digital demand grows, and this Vietnam-led project adds a new route beyond the systems that currently carry the country's international traffic. It positions a Vietnamese operator as a builder of international infrastructure rather than only a user of foreign-owned cables.
The cable is projected to lower latency for cross-border traffic between Vietnam and Singapore, which could affect the speed of international business applications. Completion is not expected until the fourth quarter of 2030, so these benefits will not reach users for several years.
The takeaway
Regional connectivity increasingly depends on who owns and builds the undersea routes, so the project's long timeline is worth tracking. Businesses planning cross-border digital investment should watch for the cable's 2030 completion date.
Further reading
For more on how undersea links shape regional connectivity, see Telecommunications.
Source note: This article includes information reported by The Straits Times.
Live Poll
Do you think Vietnam's internet and banking services are getting more reliable?



