EU Funds Medusa Cable Extension to Jordan

An €11.1 million grant, channeled through the European Investment Bank, supports extending the Medusa subsea cable from Egypt to Jordan.

Updated on Nov. 23, 2026 in Telecommunications

EU Funds Medusa Cable Extension to Jordan

The European Union is channeling an €11.1 million ($12.1 million) grant through the European Investment Bank to AFR-IX Telecom's Medusa subsea cable extension from Port Said, Egypt, to Jordan. The grant is designed to improve connectivity for research and education.

Why it matters

The project builds on an earlier €40 million EU contribution and a €60 million European Investment Bank loan, reflecting sustained public financing for Mediterranean digital infrastructure. Better links between Southern Mediterranean and European research networks could benefit students and academics across the region.

The Medusa system will span 8,700 km (5,405 miles) across 19 planned landing sites once fully deployed, with the EU grant worth €11.1 million ($12.1 million). Reported details do not yet give a completion timeline for the Jordan segment.

The players

AFR-IX Telecom

AFR-IX Telecom is a telecommunications company that operates the Medusa subsea cable system linking Europe and North Africa.

European Investment Bank

The European Investment Bank is the European Union's lending institution, owned by the bloc's 27 member states, that finances infrastructure projects.

GEANT

GEANT is the pan-European research and education network that connects national academic networks across Europe and neighboring regions.

The details

AFR-IX Telecom's Medusa subsea cable extends from Port Said, Egypt, to Jordan with the EU grant routed through the European Investment Bank. Working with GEANT, the project aims to connect around 500 institutions in the Southern Mediterranean with European counterparts.

Timeline

  1. June: The first Medusa segment went live, connecting France and Tunisia.

  2. Last month: A partnership to link Medusa to NaiTel's Coral Bridge cable was announced.

  3. This week (November 2026): AFR-IX Telecom secured the €11.1 million EU grant.

Big Picture

The grant extends the EU Neighbourhood Investment Platform's earlier €40 million contribution to Medusa, continuing a pattern of blended public financing for Mediterranean subsea cables. It shows the EU using development-bank loans alongside grants to build connectivity on its southern flank.

Students and researchers at institutions in the Southern Mediterranean may gain faster links to European academic networks once the extension is operational. Reported details do not specify when residents or institutions will see service changes.

The takeaway

Public funding for undersea cables is increasingly blended with development-bank loans, so the financing structure of these projects is worth watching alongside their technical progress. Readers interested in regional connectivity can track how the planned Syria and West African extensions develop.

Further reading

For more on how undersea networks are built and financed, explore our Telecommunications coverage.

Source note: This article includes information reported by Datacenterdynamics.