HF Sinclair Drafted Proposed Pipeline Route
The city council reviewed initial maps for the Project Westline Connect expansion.
Updated on Oct. 12, 2026 in Utilities

Live Poll
Should local governments approve pipeline expansions that follow existing utility corridors through residential areas?
HF Sinclair has provided draft pipeline route maps to Salt Lake City officials for the proposed Project Westline Connect. The project aims to increase the capacity of the existing Pioneer Pipeline that moves gasoline from Wyoming to North Salt Lake.
Why it matters
The proposed expansion is designed to increase gasoline transport capacity to help meet regional fuel demands. The draft maps are now under public review as part of the city council agenda.
The Project Westline Connect proposal aims to expand daily pipeline throughput from 60,000 barrels to approximately 95,000 barrels. This infrastructure development would involve new crossings under the Weber River and Silver Creek.
The players
HF Sinclair
This independent energy company operates refineries and associated infrastructure for the production and transport of petroleum products.
Salt Lake City Council
This municipal legislative body oversees the local government and infrastructure planning for the city.
The details
The current draft route for the expanded Pioneer Pipeline infrastructure includes segments passing through the Cherry Canyon neighborhood and across the Wasatch Fault. The proposal utilizes existing utility corridors to facilitate the capacity increase.
Timeline
The draft pipeline maps were featured on the Salt Lake City Council agenda on October 13, 2026.
Market Landscape
The proposal reflects a broader industry trend toward maximizing the throughput of existing energy infrastructure to meet regional fuel requirements. This strategy allows the company to capitalize on established corridors rather than building entirely new systems.
The project’s potential impact on the local Cherry Canyon neighborhood and regional terrain remains a primary point of interest for residents. Stakeholders can track future updates through official city council proceedings as the route selection process continues.
The takeaway
The project is currently in the draft planning phase with no final route confirmed by the developer. Residents in affected areas like Cherry Canyon should monitor future city council agendas for public comment opportunities.
Further reading
For additional context on regional infrastructure, visit Salt Lake City Utilities.
Live Poll
Should local governments approve pipeline expansions that follow existing utility corridors through residential areas?










