Energy Fuels Plans White Mesa Uranium Campaign

The company outlined processing about one million pounds of finished U3O8 at its Utah mill, with shares trading higher in premarket.

Updated on Nov. 23, 2026 in Industry

Flat-color editorial illustration of plain steel drums beside a squat milling structure and ore pile on an arid Utah mesa.
Energy Fuels plans to process about one million pounds of finished U3O8 at its White Mesa Mill in Utah, with shares trading higher in premarket. AI Illustration. Upload story photo >

Energy Fuels Inc. outlined a uranium processing campaign at its White Mesa Mill in Utah, targeting about one million pounds of finished U3O8. The company expects to process ore from its Pinyon Plain mine and La Sal Complex, with the concentrate delivered to a North American conversion facility.

Why it matters

The campaign ties the mill's output to the company's six long-term utility contracts, which provide a base of revenue, margins and cash flow. For Utah, it keeps the White Mesa Mill central to the state's uranium processing activity while the company plans to resume rare earth production there afterward.

The company projects 1.6 to 2.0 million pounds of mined and produced uranium in 2026, with average Pinyon Plain mining, milling and transport costs near $23 per pound to date. Whether these targets hold depends on permitting and market conditions that the company has not fully resolved.

The players

Energy Fuels Inc.

Energy Fuels is a uranium and rare earth elements producer that operates the White Mesa Mill in Utah and several mining projects across the western United States.

The details

Energy Fuels expects to run uranium ore and mineralized material from the Pinyon Plain mine and La Sal Complex through the White Mesa Mill, starting in December 2026. After the campaign, the company plans to resume rare earth element production at the mill using monazite already in inventory.

Timeline

  1. December 2026: White Mesa Mill uranium processing campaign begins.

  2. First quarter 2027: Processing campaign ends and 465,000 pounds are expected to be delivered under contracts.

  3. End of 2026: Remaining Bullfrog monitoring wells are expected to be finished.

  4. 2028: Whirlwind first production is scheduled, subject to permitting.

Market Landscape

The campaign is built around the company's six long-term utility contracts, which give it a contracted revenue base in a sector where producers compete for utility offtake commitments. Securing 2027 contracted sales up 35% positions the company to supply utilities as it adds production from several projects.

For Utah residents and energy watchers, the campaign keeps the White Mesa Mill operating on uranium feed while rare earth production is planned to resume afterward. Investors tracking the stock should note the company's year-to-date share decline of 65.9% and the projections that remain subject to permitting and market conditions.

The takeaway

The campaign shows how a mill's operating schedule can tie together contracted sales, ore sourcing and future product lines. Readers should watch whether the 2027 contracted volume target is met as permitting and market conditions develop.

What happens next

Energy Fuels expects to deliver 465,000 pounds under contracts in the first quarter of 2027, when the White Mesa campaign ends. Whirlwind first production is scheduled for 2028, subject to permitting.

Further reading

For broader regional energy coverage, see the Oil and Gas section, which tracks resource production trends across the state.

Source note: This article includes information reported by Asianet News Network Pvt Ltd.