Route 10 Lane Shifts Begin Nov. 18 Near I-95
Rhode Island transportation crews will move traffic on Route 10 and I-95 through late 2026 for boulevardization and bridge work.
Updated on Nov. 17, 2026 in Business

Starting the night of Nov. 18, traffic on Route 10 North will shift left just before Elmwood Avenue and move onto a new bridge over the street, according to the Rhode Island Department of Transportation. Additional lane changes on I-95 and Route 10 South follow through early December.
Why it matters
The changes affect drivers commuting between Providence and the Cranston-Warwick line, who will need to reposition early to reach their I-95 exits. Lane shifts and a mid-December I-95 closure at the Route 10 interchange will alter routine travel across Rhode Island.
The Rhode Island Department of Transportation will split I-95 South into three lanes reduced to one a half mile before the Jefferson Boulevard off-ramp starting Nov. 20. Drivers must be in the right lane for I-95 North (Exit 1B) and the left lane for I-95 South (Exit 1C) or Route 10 toward Providence.
The players
Rhode Island Department of Transportation
The state agency responsible for building, maintaining and managing Rhode Island's highways, bridges and transportation infrastructure, and the body directing these lane shifts.
The details
Traffic on Route 10 North shifts left before Elmwood Avenue and moves onto a new bridge over the street, while the I-95 North on-ramp from Exit 33A moves slightly left over I-95 starting Dec. 4. Route 10 South will shift left between Elmwood and Park Avenue starting Dec. 6 as crews build a new median barrier.
Timeline
Nov. 18, 2026: Route 10 North lane shift begins near Elmwood Avenue.
Nov. 20, 2026: I-95 South 3-1 lane split begins before Jefferson Boulevard.
Dec. 4, 2026: I-95 North Exit 33A on-ramp shifts left.
Dec. 6, 2026: Route 10 South lane shift for median barrier begins.
Mid-December 2026: I-95 closes at the Route 10 interchange for bridge demolition.
Roadmap
These lane shifts are a phase of the Route 10 boulevardization project, which converts the elevated highway into a surface boulevard through Providence and Cranston. The lane shift on Route 10 North is expected to last until spring 2027, with more changes planned as the Exit 33A ramp is reconstructed.
Commuters using Route 10 or I-95 should leave earlier and move into the required lane well before their exit to avoid last-minute merges. Drivers heading to Exit 1B, Exit 1C or Route 10 toward Providence will need to plan for changed ramp access through spring 2027.
The takeaway
Plan commutes through the Route 10 and I-95 interchange now, since lane positions must be set well before each exit. Checking the Rhode Island Department of Transportation's updates before the Nov. 18 start will help avoid delays.
What happens next
The Route 10 South shift is set to return to its normal alignment by the end of 2026, and the mid-December I-95 closure will reroute traffic at the Route 10 interchange.
Further reading
Track other road openings and closings across Rhode Island as construction continues.
Source note: This article includes information reported by USA TODAY.






