Roseman Breaks Ground on Summerlin Simulation Building

The 84,290-square-foot, three-story facility will train medicine, nursing and pharmacy students together in one building.

Updated on Nov. 20, 2026 in Industry

Photograph of an excavated construction pit in pale desert soil with concrete footing forms, rebar, and a rust-orange excavator at the edge, with a desert ridgeline beyond.
Roseman University of Health Sciences broke ground Monday on an 84,290-square-foot Medical Simulation Building in Summerlin as part of a $500 million campus expansion. AI Illustration. Upload story photo >

Live Poll

Do you think health care in Southern Nevada is getting better?

Roseman University of Health Sciences broke ground on its Medical Simulation Building in Summerlin, a three-story, 84,290-square-foot facility, with about 200 people attending the ceremony. The building is part of a $500 million expansion to establish a full campus for health care training.

Why it matters

The facility is designed to train health care professionals in Southern Nevada, with medicine, nursing and pharmacy students sharing one building for interprofessional training. It supports the university's effort to build a complete campus as its College of Medicine MD program grows in Las Vegas.

The Medical Simulation Building is expected to cost about $70 million within a $500 million expansion that will bring the Summerlin campus to 492,218 square feet. The completion timeline for the building was not provided.

The players

Roseman University of Health Sciences

A private health sciences university in Summerlin that trains medicine, nursing and pharmacy students and is leading the campus expansion.

PENTA Building Group

A Nevada construction firm serving as general contractor for the Medical Simulation Building.

The details

The building will include intensive care and medical-surgical patient rooms, trauma suites, labor and delivery suites, two operating rooms, an outpatient OSCE center, a digital anatomy lab and a multi-station retail pharmacy. Simulation spaces will feature adjoining control rooms where faculty observe and guide student performance.

Timeline

  1. November 20, 2026: Groundbreaking ceremony held for the Medical Simulation Building.

  2. January 2027: Expected start of classroom construction on the third floor of the Discovery building.

  3. July 2025: First College of Medicine MD class welcomed at a white coat ceremony.

Industry Landscape

The building extends the Roseman College of Medicine MD program that launched in 2025 with 64 members, 15 of them Nevada students, by providing a dedicated facility for shared medicine, nursing and pharmacy training. It positions the university to expand clinical education in Southern Nevada as its medical program scales.

Residents of Las Vegas may see more health care graduates trained locally as the simulation building adds clinical practice space for medicine, nursing and pharmacy students. The building's retail pharmacy and outpatient center are described in the plans, though opening dates were not provided.

The takeaway

Shared training spaces across medicine, nursing and pharmacy reflect a push to prepare health care teams to work together. Watch for construction milestones as the Summerlin campus expands.

What happens next

Construction on a new classroom on the third floor of the Discovery building is expected to begin in January 2027.

Further reading

Explore more Las Vegas healthcare coverage to see how training capacity fits into the region's medical workforce.

Live Poll

Do you think health care in Southern Nevada is getting better?