Morristown Zoning Board Reviews Ridgedale Avenue Project
Developers propose a two-building mixed-use complex on a 0.58-acre site near Route 287.
Updated on Oct. 23, 2026 in Remote Work

Live Poll
Should your community approve the construction of high-density, mixed-use buildings in established areas?
The Morristown Zoning Board held a hearing to consider a proposal from DKRL, LLC for a mixed-use development at 75-81 Ridgedale Avenue. The project features ground-floor retail and upper-level apartment units across two buildings.
Why it matters
The developer seeks bulk C and D variances to allow two structures on the lot, as current town codes restrict mixed-use small urban developments to a single building. The site plan must also incorporate specific safety and environmental measures due to its proximity to the highway and a local waterway.
The development plan for the 0.58-acre property includes 18 parking spaces and requires a 3.5-foot elevation increase above the lot to comply with flood mandates. The site sits atop a subterranean high-voltage JCP&L power line.
The players
Morristown Zoning Board
This local government body is responsible for reviewing and approving land-use applications and zoning variances within the city.
DKRL, LLC
This real estate development company is the applicant proposing the mixed-use project at 75-81 Ridgedale Avenue.
The details
The project design includes the construction of a safety wall and fencing to buffer the property from the adjacent Route 287. Adherence to floodplain regulations near the Whippany River is a critical component of the current site plan.
Timeline
The Morristown Zoning Board conducted the hearing on October 21, 2026.
Traffic and planning testimony for the development is expected in November 2026.
Market Landscape
The proposal tests the limits of the town's mixed-use urban small development code by seeking variances to bypass density restrictions. This development signals a broader trend of maximizing site utility in constrained corridors near major highway arteries.
Local residents and businesses may face future traffic adjustments or shifts in area density if the zoning board grants the requested variances. The outcome of these hearings will determine the scale and nature of new retail and housing options available in the immediate neighborhood.
The takeaway
Zoning hearings represent a crucial intersection between private development interests and public infrastructure safety. Stakeholders should monitor upcoming testimony sessions to understand the long-term impact on local property use and municipal density standards.
Further reading
For more information on local development trends, visit the Remote Work section.
Source note: This article includes information reported by Morristowngreen.
Live Poll
Should your community approve the construction of high-density, mixed-use buildings in established areas?










