UNL Students Build Block N Walkway at Abel Hall

A materials and specifications class replaced a grass patch damaged by move-in traffic with a brick walkway.

Updated on Nov. 12, 2026 in College Life

Brick walkway with a geometric Block N-inspired pattern curving across fresh green lawn beside a brick campus building under a clear autumn sky.
University of Nebraska-Lincoln students finished a brick walkway in the shape of the Nebraska Block N in front of Abel Hall in mid-October 2026. AI Illustration. Upload story photo >

University of Nebraska-Lincoln students built a brick walkway shaped like the Nebraska Block N in front of Abel Hall, celebrated by mid-October 2026 after a week-long build. The walkway replaces a grass patch that cars destroyed each year during move-in time.

Why it matters

The project turns a recurring annual repair into a lasting feature while giving students hands-on training with industry partners. It also ends a cycle in which the class previously built a wall, tore it down and sent the materials to the landfill each year.

Industry partners donated around $40,000 in materials and time for the project, which was carried out by a materials and specifications class of 130 students. The source does not report the long-term maintenance plan for the walkway.

The players

University of Nebraska-Lincoln

A public land-grant university in Lincoln, Nebraska, whose materials and specifications class carried out the project.

Hawkins

An Omaha-based construction company among the industry professionals connected to the walkway project.

The details

Students learned about compaction, soils, masonry and pavers before laying brick in a shape resembling the Nebraska Block N. Industry professionals oversaw the build, and sophomore construction management major Iyah Aguer handled logistics and logged student hours on an Excel spreadsheet. The class code CNST 251 is engraved in one of the last bricks laid.

Timeline

  1. Each year during move-in time, cars drove over and destroyed the grass patch in front of Abel Hall.

  2. Months before the build, students studied compaction, soils, masonry and pavers.

  3. Mid-October 2026, the class celebrated the installation after a week-long build.

Campus Context

The project replaces a grass patch that was destroyed by cars every move-in season, ending a yearly repair cycle at Abel Hall. Its brick surface is meant to last where the grass could not withstand the traffic.

The walkway changes how students and visitors move through the area in front of Abel Hall, offering a permanent path where grass once wore away each move-in season. For Lincoln residents and students, it is a visible result of a campus class that combined coursework with industry collaboration.

The takeaway

The project shows how classroom work can solve a recurring physical problem on campus while reducing waste from a previous build cycle. Students who want hands-on experience can look for similar collaborations between their programs and local industry partners.

Further reading

For more on campus traditions and student projects, explore College Life coverage from Lincoln.

Source note: This article includes information reported by The Daily Nebraskan.