Maryland Advances American Legion Bridge Replacement Plan

The state has released a presolicitation memorandum seeking private-sector input on financing and building a new crossing over the Potomac.

Updated on Nov. 17, 2026 in Family

Wide view of a long steel truss bridge spanning a river between green forested banks under soft overcast haze, carrying light highway traffic.
Maryland officials released a presolicitation memorandum seeking private-sector input on financing and building a replacement for the 64-year-old American Legion Bridge over the Potomac. AI Illustration. Upload story photo >

Live Poll

Do you think now is the right time for the state to replace the American Legion Bridge?

The Maryland Department of Transportation released a presolicitation information memorandum for the American Legion Bridge and I-270 Multimodal Corridor program. The memorandum outlines how the state will evaluate financing and construction options but does not finalize how the project will be funded or built.

Why it matters

The bridge, which connects Montgomery County, Maryland, and Fairfax County, Virginia, on the Capital Beltway, is a vital commuter route for the region. The state's effort to replace it signals a long-term plan to address aging infrastructure and growing congestion.

The bridge opened in 1962 with six lanes and was expanded to 10 lanes in 1992 as traffic grew from about 48,000 vehicles a day to more than 230,000 today. The latest proposal is scaled back from an original $7.6 billion plan, and final funding has not been determined.

The players

Wes Moore

Wes Moore is the Governor of Maryland, who directed state officials to fully evaluate financing options for the American Legion Bridge.

Katie Thomson

Katie Thomson is a Maryland public official connected to the state's transportation planning for the American Legion Bridge program.

Maryland Department of Transportation

The Maryland Department of Transportation is the state agency responsible for transportation infrastructure, including the bridge replacement program and its presolicitation memorandum.

The details

State officials will explore replacing the 64-year-old bridge in collaboration with federal, private-sector, regional and local partners. The state is seeking private-sector input through the memorandum, with the project intended to enhance connections, reduce congestion at major bottlenecks, and add transit and bike, walking and rolling access across the Potomac River.

Timeline

  1. 1962: The bridge opened as the Cabin John Bridge with six lanes of traffic.

  2. 1969: The bridge was renamed the American Legion Bridge.

  3. 1992: The bridge was expanded to 10 lanes.

  4. November 17, 2026: The Maryland Department of Transportation released the presolicitation memorandum for the program.

Legacy Infrastructure

The American Legion Bridge's replacement follows the expansion of the crossing from six to 10 lanes in 1992, a response to traffic that has nearly quintupled since the 1960s. The state's move to a privately informed financing model marks a shift from the earlier $7.6 billion plan toward a scaled-back approach.

Commuters who cross the American Legion Bridge daily will face construction and financing decisions that could affect travel times once a final plan is set. The memorandum does not yet change routes, tolls or service, so residents should expect no immediate changes.

The takeaway

Replacing aging infrastructure like the American Legion Bridge requires balancing rising traffic demands against costly financing choices. Residents who depend on the crossing should watch for the state's final funding and construction decisions.

Further reading

For more on the region's living conditions and services, see Eldercare coverage for Maryland.

Live Poll

Do you think now is the right time for the state to replace the American Legion Bridge?