Palm Coast Board Approves 150-Foot Cell Tower

The Planning Board voted unanimously to approve a new monopole tower and a commercial site plan on Sesame Boulevard.

Updated on Oct. 22, 2026 in Construction

Bold flat-color editorial illustration of a solitary steel monopole cell tower rising above stylized coastal vegetation.
The Palm Coast Planning Board unanimously approved a new 150-foot monopole cell tower on Sesame Boulevard to bolster local wireless connectivity. AI Illustration. Upload story photo >

Live Poll

Do you support the construction of new cell towers in your local community for better service?

The Palm Coast Planning Board has approved the construction of a 150-foot monopole cell tower on a 13-acre property located on Sesame Boulevard. The board granted the project a special exception in a 7-0 vote.

Why it matters

The tower project aims to enhance wireless connectivity in the area by providing infrastructure for Verizon Wireless and three additional carriers. The site will also feature a new gas station, restaurant, and retail space to expand local commercial options.

The tower site occupies 2,500 square feet and will sit 335 feet from the nearest residential property. The surrounding commercial development includes a 4,000-square-foot gas station and 5,000 square feet of office or retail space.

The players

Palm Coast Planning Board

This local government body is responsible for reviewing and approving site plans and land-use exceptions within the city.

Verizon Wireless

This telecommunications company provides wireless services and intends to utilize the new infrastructure to improve local network coverage.

CityScape

This organization reviews tower applications to ensure that proposed developments comply with municipal codes and the city master plan.

The details

The tower will be constructed from galvanized steel with a gray finish and surrounded by an 8-foot white plastic fence. Before construction can begin, the project requires a structural analysis report completed by a Florida licensed professional engineer.

Timeline

  1. The city assigned the project to CityScape for review in March 2026.

  2. The Planning Board officially approved the tower on October 21, 2026.

  3. Construction of the cell tower is anticipated to begin in the first quarter of 2027.

Market Landscape

This development reflects the ongoing suburban push to integrate telecommunications infrastructure with mixed-use commercial space. By co-locating essential utility towers with retail and dining, the city aims to balance service needs with broader commercial growth.

Residents can expect improved cellular reception once the carrier equipment is installed in 2027. The project also introduces new retail and dining options to the Sesame Boulevard corridor as part of the imminent commercial construction.

The takeaway

Property owners located near the site should note the tower location is set 335 feet from the nearest residential boundary. Future upgrades to the tower equipment will ensure the site remains compliant with evolving wireless technology standards.

What happens next

Construction of the cell tower is scheduled to occur during the first quarter of 2027.

Further reading

For more information on current infrastructure projects, visit the Construction section.

Source note: This article includes information reported by FlaglerLive.

Live Poll

Do you support the construction of new cell towers in your local community for better service?