City to Host Washington Park Stormwater Workshop

Pasadena residents can help shape the Washington Park Stormwater Capture Project at a December 3 community workshop.

Updated on Nov. 19, 2026 in Politics

City to Host Washington Park Stormwater Workshop

Live Poll

Do you think the city is spending local tax dollars wisely on neighborhood parks?

The Pasadena Department of Public Works will hold a community engagement workshop on December 3, 2026, from 3 to 6 p.m. to gather input on the Washington Park Stormwater Capture Project. The project aims to intercept and treat runoff from the East Side Storm Drain before it reaches downstream waterways.

Why it matters

The project is intended to reduce pollutants reaching Rubio Wash, the Rio Hondo River and the Los Angeles River, and resident input will help guide a refined design concept. Pasadena's Safe, Clean Water Program funding is financing the effort.

City records show $12,649,271 in Safe, Clean Water Program funding was authorized in 2025 and a design contract with SWA Group could reach $2,089,007 including contingencies, serving a drainage area of about 527 acres. No confirmed construction timeline has been published.

The players

Pasadena Department of Public Works

The city department responsible for planning, building and maintaining Pasadena's public infrastructure, including stormwater systems.

Pasadena City Council

The elected legislative body of the City of Pasadena, which authorized project funding and considered the design contract.

SWA Group

A landscape architecture and planning firm considered for the project's engineering and design services contract.

The details

Runoff will be filtered through a pretreatment system and directed into underground facilities for storage and groundwater recharge. Potential aboveground improvements under discussion include native landscaping, shade trees, habitat areas and accessible park amenities.

Timeline

  1. 2025: City Council authorized Safe, Clean Water Program funding for the project.

  2. May 2026: City Council considered the SWA Group design services contract.

  3. November 18, 2026: The city announced the workshop and invited residents to share feedback.

  4. December 3, 2026: Community workshop runs from 3 to 6 p.m.

City Hall Context

The project is funded through the Safe, Clean Water Program, a regional stormwater initiative, and applies its goal of capturing runoff locally before it reaches the Los Angeles River system. Its design phase follows the completion of a feasibility study.

Pasadena residents who want a say in Washington Park's future can attend the December 3 workshop or complete the online survey. Input will shape potential improvements such as native landscaping, shade trees and accessible park amenities.

The takeaway

Residents who participate in early design workshops can influence park features before a final concept is set. Attending or responding to the survey is a direct way to shape how stormwater infrastructure fits into a neighborhood park.

What happens next

The Washington Park community workshop takes place December 3, 2026, from 3 to 6 p.m., and residents can complete an online survey afterward to inform the refined design concept.

Further reading

Find more local government coverage in Pasadena City Hall.

More information

Share your ideas in the community survey about preferred park improvements.

Source note: This article includes information reported by Pasadena Now.

Live Poll

Do you think the city is spending local tax dollars wisely on neighborhood parks?