County Opens Harbor-UCLA Outpatient Center
Los Angeles County consolidated scattered clinics into a single six-story outpatient building at Harbor-UCLA Medical Center.
Updated on Nov. 27, 2026 in Industry

Live Poll
Do you trust Los Angeles County to deliver good public hospital care?
Los Angeles County opened the six-story outpatient center at Harbor-UCLA Medical Center on September 9, 2026. The approximately 374,000-square-foot building brings together clinics previously scattered around the campus.
Why it matters
The building is designed to make care easier to navigate by placing dispersed clinics in one location. It is a key part of the county's $1.8 billion replacement program for the medical center, which is being carried out while the existing hospital remains operational.
The outpatient building contains 236 examination rooms, 29 treatment spaces and 26 cancer infusion bays, alongside a separate 30,000-square-foot regional laboratory and a completed 1,508-space parking structure. The $1.8 billion replacement program includes six new buildings, and the timeline for the replacement hospital's completion and opening has not been finalized beyond projections.
The players
Los Angeles County
Los Angeles County is the largest county in the United States by population and owns and operates the Harbor-UCLA Medical Center.
Hensel Phelps
Hensel Phelps is a large privately held construction firm headquartered in Colorado that leads the design-build team on the project.
The details
Ground-floor services include pharmacy, blood drawing, orthopedics, imaging and outpatient rehabilitation. Los Angeles County Public Works manages the expansion, with Hensel Phelps leading the design-build team. Architects used nurse movement data from wearable devices to test layouts intended to reduce walking for staff and patients, and services are being relocated in stages.
Timeline
September 9, 2026: Los Angeles County opened the outpatient clinic building.
January 7, 2027: Family Medicine Primary Care is scheduled to relocate from the Family Health Center on Lomita Boulevard to the main Harbor-UCLA campus, on or after this date.
Mid-2027: Replacement hospital construction is anticipated to be completed.
Early 2028: Patient services at the replacement hospital are expected to begin.
Healthcare Landscape
The Harbor-UCLA project follows the county's multi-decade effort to modernize its public safety-net hospital system while keeping existing services running. Building new outpatient capacity before replacing the inpatient hospital reflects a phased approach to reconstructing aging public medical facilities.
Patients who use Family Medicine Primary Care will need to follow the service's move from the Family Health Center on Lomita Boulevard to the main campus beginning January 7, 2027. Consolidated ground-floor services such as pharmacy, blood drawing, imaging and rehabilitation are designed to reduce the number of separate stops required for care.
The takeaway
Consolidating outpatient services into one building can shorten the distance patients walk between appointments, but the full benefit will depend on how smoothly the staged relocations proceed. Patients with appointments at the Family Health Center should watch for scheduling changes ahead of the January 7, 2027 transition.
What happens next
Family Medicine Primary Care is scheduled to relocate to the main Harbor-UCLA campus on or after January 7, 2027, and replacement hospital completion is anticipated in mid-2027.
Further reading
For more on hospital capacity and public health infrastructure, see Healthcare coverage.
Source note: This article includes information reported by Citywatchla.
Live Poll
Do you trust Los Angeles County to deliver good public hospital care?






