Eagle Rock Pushes Back on Colorado Blvd Bus Plan

Residents and business owners are asking Councilmember Ysabel Jurado to pause the LA Metro Bus Rapid Transit project.

Updated on Nov. 27, 2026 in City Hall

Wide empty urban boulevard lined with low-rise storefronts, palm trees, and curbside parking under warm late-afternoon light, suggesting a street facing a proposed lane change.
Los Angeles Metro's Bus Rapid Transit plan would convert two of Colorado Boulevard's four Eagle Rock lanes to bus-only use and remove about 190 parking spots, prompting residents to ask Councilmember Ysabel Jurado to pause it. AI Illustration. Upload story photo >

Live Poll

Do you support converting Colorado Boulevard lanes to bus-only lanes?

Eagle Rock residents and business owners are pushing back against the LA Metro Bus Rapid Transit project, which would convert two of four Colorado Boulevard lanes into bus-only lanes. A petition asks Councilmember Ysabel Jurado to pause the project.

Why it matters

The project would remove about 190 parking spots and reduce drivers to one lane in each direction on the affected stretch, and business owners in the area expect parking removal to cause losses. Residents in Los Angeles who rely on Colorado Boulevard for daily travel or local shopping would feel these changes directly.

The project plan calls for about 190 parking spots to be removed and two of four Colorado Boulevard lanes converted to bus-only lanes. The Metro Board approved the project in April 2022, and the extraction does not say whether a pause request will be considered.

The players

LA Metro

The Los Angeles County Metropolitan Transportation Authority, which operates the region's bus and rail system and is leading the Bus Rapid Transit expansion.

Ysabel Jurado

The Los Angeles City Councilmember whose office is the target of a petition asking for the project to be paused.

The details

LA Metro is expanding Bus Rapid Transit to connect North Hollywood to Pasadena through Burbank, Glendale and Eagle Rock, using zero-emission electric buses in dedicated lanes. The project was certified by a final Environmental Impact Report and is funded in part by Measure M taxpayer dollars.

Timeline

  1. April 2022: The Metro Board approved the Bus Rapid Transit project.

  2. November 27, 2026: Local reporting on business pushback against the project was published.

Legal Context

The project is funded in part by Measure M, the county transportation tax, and it moves forward under a final Environmental Impact Report. The Eagle Rock opposition shows how the same funding and approval process can meet local resistance once street-level tradeoffs become concrete.

Drivers and shoppers along Colorado Boulevard in Eagle Rock would lose about 190 parking spots and face one lane in each direction on the affected portion. Businesses along the corridor expect reduced customer access during and after construction.

The takeaway

Residents who depend on Colorado Boulevard for parking or local business should track the petition to pause the project and any coordination updates from Metro during construction. Watching how Metro responds to community feedback will show how much the final corridor design can still change.

Further reading

For more on how city officials weigh transit proposals against neighborhood concerns, see City Hall coverage in Los Angeles.

Source note: This article includes information reported by NBC Southern California.

Live Poll

Do you support converting Colorado Boulevard lanes to bus-only lanes?