Central Alabama Water Plans $1.4 Billion Pipe Overhaul
The 10-year infrastructure plan aims to cut water losses from aging pipes that have driven a high share of non-revenue water.
Updated on Nov. 24, 2026 in Industry

Live Poll
Do you think your local water system is getting better or worse?
Central Alabama Water plans to spend $1.4 billion over 10 years on infrastructure, after its share of non-revenue water fell from 53% last year to 48% earlier this month. The utility says work on the plan began in January.
Why it matters
Non-revenue water costs the utility about $12 million a year, and aging pipes lead to repeat leaks that affect water service across Birmingham and nearby areas. The plan targets the root cause rather than continuing to repair leaks one at a time.
Central Alabama Water estimates non-revenue water costs about $12 million a year, and the utility's backlog stands at 550 miles of pipe to replace. At the current replacement rate, replacing all pipes more than 100 years old would take decades.
The players
Central Alabama Water
Central Alabama Water is the regional water utility serving Birmingham and surrounding communities.
The details
More than 500 miles of pipe in the system are over 100 years old, including 40 to 60 miles of galvanized pipe nearly 100 years old. Much of the non-revenue water loss comes from leaks, which in Birmingham and parts of Homewood and Mountain Brook can reach 70% to 80% of water flowing through pipes.
Timeline
January 2026: Work on the 10-year infrastructure plan began.
Last year (2025): Non-revenue water share peaked at 53%.
Earlier this month (November 2026): Non-revenue water share fell to 48%.
This year (2026): The utility fixed 2,300 leaks, double the normal rate.
The plan will take nine or 10 years to complete.
Industry Context
Cities such as Jackson, Mississippi and Flint, Michigan have faced public water crises tied to aging distribution systems, and Central Alabama Water's $1.4 billion plan is a proactive attempt to avoid a similar outcome in the Birmingham area. The utility's 550-mile replacement backlog shows how far the region has to go.
Birmingham-area residents may see fewer leaks and service interruptions as the 550-mile replacement backlog is worked down over the next nine or 10 years. The plan's pace means meaningful changes will be gradual rather than immediate.
The takeaway
Aging infrastructure drives repeat leaks and lost revenue, so the utility's shift toward full pipe replacement signals that long-term fixes cost more upfront but reduce recurring losses over time.
Further reading
For more on how local providers are handling infrastructure, see Utilities coverage for Birmingham.
Source note: This article includes information reported by Wbrc.
Live Poll
Do you think your local water system is getting better or worse?






