F-35C Completes Carrier Launch and Recovery Tests
Two Lightning II test jets logged 34 flights aboard the USS John F. Kennedy during an 11-day sea trial.
Updated on Nov. 23, 2026 in Transportation

Live Poll
Do you think the U.S. should spend more on its military?
Two F-35C Lightning II fighters completed their first launch and recovery operations from a Ford-class aircraft carrier. The jets made 34 flights aboard the USS John F. Kennedy, with the electromagnetic catapult launching them 122 times and the arresting gear catching them in 122 landings.
Why it matters
Lockheed Martin said the test phase clears the F-35C for duty across the Navy's entire carrier fleet. The trials also marked the first time early Block 4 mission-systems software ran in a carrier setting.
The Navy's $93.2 million order to Lockheed Martin covers F-35 depot test equipment, software refreshes and added repair capacity, with most work in Malabar, Florida. The source does not report how the 2,100-plus supplier base or the depot order will affect program costs beyond that figure.
The players
Lockheed Martin
A major U.S. aerospace and defense company and the prime contractor for the F-35 Lightning II program.
The details
Engineers verified the EMALS and Advanced Arresting Gear software and shipboard installations, and checked the F-35C's loads and structural models against actual launch and recovery conditions. The first recovery aboard the ship occurred on Oct. 13, the Navy's 251st foundation anniversary.
Timeline
Oct. 13, 2025: First F-35C recovery aboard the USS John F. Kennedy.
July 2025: $578.7 million delivery order for initial F-35 spare parts issued.
November 2025: $178.4 million contract modification for Lots 20-22 materials awarded.
January 2030: Expected completion of depot test equipment work.
Market Landscape
The F-35C's carrier qualification follows the Ford-class program's shift from legacy catapult systems to EMALS and AAG, which change how aircraft are launched and recovered at sea. Clearing the variant for the full carrier fleet positions the F-35 program to sustain its role as the Navy's primary strike fighter, with more than 2,100 suppliers in over a dozen countries supporting that effort.
The clearance means F-35C squadrons across the Navy's carrier fleet can now operate from Ford-class ships with validated launch and recovery systems. For defense-sector workers, the program's support of about 317,000 direct and indirect jobs and the $79 billion in annual economic activity tied to it remain the most direct local effects.
The takeaway
The F-35C's carrier qualification shows how new mission-systems software and shipboard launch technology must be validated together before a fighter can serve across an entire fleet. Readers tracking defense procurement can watch the January 2030 depot milestone as a measure of sustained program support.
What happens next
Depot test equipment work under the $93.2 million Naval Air Systems Command order is expected to be completed by January 2030.
Further reading
Explore more coverage in the Transportation section for context on how military aviation programs fit into the broader industry.
Source note: This article includes information reported by ExecutiveBiz.
Live Poll
Do you think the U.S. should spend more on its military?






