Power Electronics Supplies Edify's Australian Hybrid Projects
Power Electronics will supply grid-forming conversion systems for Edify Energy's 2.4GWh hybrid projects in Australia, alongside a cell and container supply deal.
Updated on Nov. 17, 2026 in Energy

Power Electronics is supplying grid-forming power conversion systems for Edify Energy's 2.4GWh hybrid solar-and-storage projects in Australia. CATL is separately supplying 2,400MWh of battery energy storage for two 300MW units connecting to Powerlink's 275kV network.
Why it matters
The projects pair solar generation and battery storage behind a single set of grid-forming inverters, which the plants will use to provide Frequency Control Ancillary Services and other network support. The arrangements add to the capacity that Australian grid operators and large industrial buyers are relying on as renewable generation expands.
Edify's supply deals cover 2,400MWh of CATL battery storage for two 300MW units, within a 2.4GWh hybrid project and a 3.6GWh solar-plus-storage EPC contract. The source does not state the final commissioning schedule beyond the 2028 target.
The players
Edify Energy
Edify Energy is an Australian renewable energy developer that is building solar-plus-storage projects across the country, including hybrid plants connected to the national grid.
Power Electronics
Power Electronics is a Spanish manufacturer of power conversion equipment for solar and storage, reporting 170GW of installed AC capacity across 36 countries.
CATL
CATL, the Contemporary Amperex Technology Co., is a Chinese battery manufacturer and one of the largest suppliers of lithium-ion batteries for grid-scale energy storage.
The details
Power Electronics' Freesun DC/DC converters route solar output to the battery storage before final conversion to AC, and the two 300MW units connect to Powerlink's 275kV network through a new terminal station. Edify also took three Tender 4 Capacity Investment Scheme slots, including its Nowingi project in Victoria.
Timeline
March 2025: Rio Tinto signed two 20-year hybrid services agreements to procure 90% of the power and storage capacity for its Gladstone aluminium operations.
2028: Commercial operations are targeted for the Edify hybrid plants.
Roadmap
Grid-forming inverters using Virtual Synchronous Machine control are being deployed to make solar-and-storage plants behave like traditional synchronous generators on the grid. Edify's hybrid projects apply that approach to a shared solar and battery system connected to Powerlink's 275kV network.
The projects are designed to provide Frequency Control Ancillary Services and other network support once commercial operations begin, which is targeted for 2028. Whether these services reach the grid on that timeline depends on construction and commissioning progress not yet reported.
The takeaway
Grid-forming inverters allow a single set of equipment to manage both solar output and battery storage while supporting grid stability. As similar hybrid plants come online, their ability to provide frequency support will matter more to how Australia's grid is operated.
Further reading
For more on the grid-scale storage and generation projects shaping the sector, see Energy coverage.
Source note: This article includes information reported by Energy Storage News.






