INPEX Approves Ichthys LNG Phase 2c Offshore Development

The Australian project's operator has cleared five new production wells targeting the Brewster reservoir.

Updated on Nov. 22, 2026 in Oil and Gas

Distant offshore gas production platform with a flare stack above calm grey sea under overcast daylight, with a pipeline running toward the horizon.
INPEX approved five new production wells for the Ichthys LNG project's Brewster reservoir, a Phase 2c offshore development to sustain output at a facility producing up to 9.3 million tonnes of LNG annually. AI Illustration. Upload story photo >

INPEX approved the Phase 2c Part 1 offshore development for the Ichthys LNG project, which will add five production wells targeting the Brewster reservoir. The investments use existing offshore drill centers, subsea pipelines and infrastructure, building on the Phase 2a subsea development and Phase 2b booster compression project.

Why it matters

The investments are designed to sustain and extend plateau production and improve long-term reservoir recovery at a facility that can produce up to 9.3 million tonnes of LNG a year. Ichthys output is central to supplying Japanese buyers, who receive about 70% of it.

The approval adds five production wells to a facility capable of 9.3 million tonnes of LNG annually, with output equal to roughly 8% of Japan's and Taiwan's LNG imports and 10% of Australia's LNG exports. The source does not disclose the development's cost or start-up schedule.

The players

INPEX

INPEX is a Japanese energy company that operates the Ichthys joint venture and holds a major role in the Ichthys LNG project in Australia.

The details

INPEX, which operates the Ichthys joint venture, approved the Phase 2c Part 1 offshore development, which targets the Brewster reservoir through the project's existing subsea pipeline and offshore infrastructure. The work is designed to maintain plateau production and improve long-term reservoir recovery.

Timeline

  1. November 20, 2026: INPEX announced approval of the Phase 2c Part 1 development.

Roadmap

The Phase 2c Part 1 approval continues the staged expansion of the Ichthys field, following the Phase 2a subsea development and Phase 2b booster compression project. Each stage reuses existing offshore infrastructure rather than building new facilities.

The approval signals continued LNG supply from the Ichthys facility to Japanese, Taiwanese and Australian markets over the project's extended production life. For energy buyers and utilities relying on this supply, the investment points to sustained output rather than a near-term decline.

The takeaway

Long-term investment in existing offshore infrastructure can extend the productive life of a major energy asset without building new facilities. Readers tracking LNG supply to Asia can watch the Ichthys project as a case study in staged reservoir recovery.

Further reading

For broader context on how liquefied natural gas supply is shaped, see Oil and Gas coverage.

Source note: This article includes information reported by World Oil.