Create Energy Adds Ampt Optimisers to ONTRACK
Create Energy and Ampt will combine string optimisers and battery converters on the ONTRACK platform for developers and utilities.
Updated on Nov. 20, 2026 in Energy

Live Poll
Do you expect your household electricity costs to rise over the next few years?
Create Energy has partnered with Ampt to add Ampt's string optimisers and battery converters to its ONTRACK platform. The move comes alongside a new battery energy storage offering for the same portfolio.
Why it matters
The agreement gives developers and utilities a single procurement route for renewable energy and related electrical infrastructure. Optimiser-based module blending may help operators repower ageing arrays and manage purchasing costs amid supply constraints.
The announcement cites 800 VDC as the voltage architecture supported by Ampt's battery converters for data centre applications. Pricing and deployment volumes for the offering have not been disclosed.
The players
Create Energy
Create Energy is a renewable energy company that operates the ONTRACK procurement platform for solar and storage equipment.
Ampt
Ampt is a company focused on DC power management technology, including string-level optimisers and battery converters for solar arrays.
The details
The products will be sold individually or within pre-engineered Create systems, covering DC-coupled storage, solar repowering and data centre infrastructure. Ampt's string optimisers can connect newer higher-voltage inverters with ageing arrays and combine modules with differing electrical characteristics in one array.
Timeline
Ampt string optimisers are expected on the ONTRACK platform in the first quarter of 2027.
Ampt battery converters are expected on the platform in the third quarter of 2027.
The Tech Race
The partnership fits a broader push to move high-voltage DC architectures from data centres into renewable generation and storage. It positions Create Energy's procurement platform as a channel for DC power components that previously sat outside standard solar supply chains.
Developers and utilities gain a single route to buy optimisers, battery converters and factory-assembled systems. Repowering older solar arrays may become simpler as new modules can be mixed with existing installations.
The takeaway
Operators planning solar repowering or storage projects should watch the 2027 availability windows on ONTRACK for these components. Early evaluation of optimiser-based module blending could reduce integration time on mixed-age arrays.
Further reading
Explore more reporting in the Energy section for context on storage and grid infrastructure.
Source note: This article includes information reported by DataCenterNews US.
Live Poll
Do you expect your household electricity costs to rise over the next few years?



