Wyoming Gets $6.7M to Upgrade Green River Tunnels

A federal grant will fund safety and communication upgrades to twin tunnels carrying heavy freight on Interstate 80.

Updated on Nov. 9, 2026 in Automotive

Bold flat-color vector editorial illustration of a highway tunnel portal cut into a red sandstone bluff, with a truck entering and a blank overhead sign.
Wyoming received a $6.7 million federal grant covering 87% of the cost to upgrade the twin Green River tunnels on Interstate 80. AI Illustration. Upload story photo >

Live Poll

Should federal money be spent upgrading aging highway tunnels for safety?

Wyoming has received a $6.7 million federal grant to upgrade the Green River tunnels on Interstate 80, covering 87% of the project cost. The upgrades target a freight corridor where the state says closures would have no viable detour.

Why it matters

The twin tunnels sit on a route carrying roughly 50% truck traffic, and a February 2025 multiple-fatality crash at the site highlighted gaps in tunnel safety features. The upgrades aim to reduce the risk of catastrophic closures on a key interstate for Wyoming drivers and freight carriers.

The twin tunnels each carry two lanes roughly 1,200 feet long in both directions, and the grant covers 87% of the project's cost. WYDOT has secured more than $179 million in competitive grants over the last five years.

The players

Wyoming Department of Transportation (WYDOT)

The state agency responsible for Wyoming's highways, which has secured more than $179 million in competitive grants over five years and is leading the Green River tunnel upgrade.

U.S. Department of Transportation (USDOT)

The federal agency that awarded the Nationally Significant Multimodal Freight grant funding the Green River tunnel project.

The details

Upgrades include electronic message signs, variable speed limit signs, and road-weather information units with web cameras at both tunnels. The eastbound tunnel will receive intelligent dimming lighting and both tunnels will get dry-pipe fire suppression and bidirectional amplifier systems to improve emergency communications.

Timeline

  1. February 2025: Multiple-fatality crash occurs at the Green River tunnel site.

  2. October: Project receives USDOT Nationally Significant Multimodal Freight grant.

  3. Fall 2027: Project expected to go out to bid.

  4. Spring 2028: Real construction anticipated to begin.

Roadmap

Federal freight-corridor grants are increasingly directing money toward aging interstate infrastructure that carries heavy truck volumes. The Green River award fits this pattern, funding upgrades on a tunnel built in 1966 along a route where truck traffic dominates.

Drivers on I-80 near Green River should expect the tunnel upgrades to shape traffic management once construction begins in spring 2028. The improvements target emergency communications and fire suppression, reducing the risk of long closures on a route with no viable detour.

The takeaway

Safety upgrades on heavily trafficked freight tunnels can be funded largely through federal grants, but the timeline from award to construction runs well over a year. Readers tracking I-80 should watch for the 2027 bid announcement.

What happens next

WYDOT expects to send the project out to bid in fall 2027, with real construction not anticipated until spring 2028.

Further reading

For more on heavy-vehicle routes and freight infrastructure, see Trucks coverage across Wyoming.

Source note: This article includes information reported by Transport Topics.

Live Poll

Should federal money be spent upgrading aging highway tunnels for safety?