Group Pitches Street-Level Boulevard for I-794 Spur

Rethink 794 released a Better Boulevard Plan urging WisDOT and Milwaukee to weigh a street-level replacement for part of the Downtown spur.

Updated on Nov. 29, 2026 in Industry

Isometric editorial illustration of a single elevated concrete ramp descending to a street-level block of brick buildings, in muted slate, cream, and oxblood.
Rethink 794 urged WisDOT and Milwaukee on November 18 to weigh a street-level boulevard to replace part of the Downtown I-794 spur among proposed alternatives. AI Illustration. Upload story photo >

Live Poll

Do you support replacing parts of freeways downtown with street-level boulevards?

Rethink 794, a volunteer community group, released a Better Boulevard Plan to replace part of the I-794 spur Downtown with a street-level boulevard. The group sent a November 18 letter urging the Wisconsin Department of Transportation and Milwaukee to incorporate the plan into proposed alternatives.

Why it matters

The plan is pitched as lowering replacement costs compared with WisDOT's option while adding land and dispersing traffic to local streets more effectively. Its inclusion among the alternatives under consideration would shape how the spur is rebuilt.

The Better Boulevard Plan would cut replacement costs relative to WisDOT's option and add eight acres of land, with the extra acreage near the Intermodal Station on the western end of the spur. WisDOT has explored three options since 2022, and the cost comparison has not been independently verified in the extraction.

The players

Rethink 794

A volunteer community group advocating for a street-level boulevard to replace part of the I-794 spur Downtown.

Wisconsin Department of Transportation

The state agency that has been exploring three replacement options for the I-794 spur since 2022.

The details

Rethink 794 proposes replacing part of the I-794 spur Downtown with a street-level boulevard that uses better utilization of existing freeway ramp connections, removing the need for redundant ramps from the Marquette Interchange. The three options WisDOT is weighing are in-kind replacement, replacement with changes, and replacement with a boulevard.

Timeline

  1. Since 2022: WisDOT began exploring three options for the I-794 spur.

  2. November 18: Rethink 794 sent a letter urging WisDOT and Milwaukee to incorporate the plan.

  3. November 29, 2026: Rethink 794 released the Better Boulevard Plan.

Transportation Shift

The Rethink 794 proposal fits a pattern of community groups pressing state transportation agencies to reconsider aging urban freeway spurs in favor of street-level replacements. WisDOT's three-option review since 2022 puts the boulevard alternative in direct competition with in-kind rebuilding.

The outcome will determine whether the I-794 spur is rebuilt as a freeway or converted into a street-level boulevard that changes local traffic patterns. Milwaukee drivers and nearby residents would feel the change in how traffic flows to surface streets.

The takeaway

Community proposals can add concrete alternatives to state infrastructure planning, so residents who want a say should track whether the plan is formally incorporated into the options under review.

Further reading

Explore more Milwaukee transportation coverage on how freeway projects shape the city.

Source note: This article includes information reported by Milwaukee Neighborhood News Service.

Live Poll

Do you support replacing parts of freeways downtown with street-level boulevards?