I-5 Express Lanes to Close Nightly Through Dec. 3

WSDOT will reduce and close northbound I-5 express lanes across the Ship Canal Bridge overnight for drainage work.

Updated on Nov. 28, 2026 in Industry

Wide view of a concrete highway bridge over a calm canal at dusk, northbound lanes blocked by orange traffic cones and a concrete barrier.
Washington State Department of Transportation will close northbound I-5 express lanes across the Ship Canal Bridge overnight from Nov. 30 through Dec. 3 for drainage work. AI Illustration. Upload story photo >

The Washington State Department of Transportation will reduce northbound I-5 express lanes across the Ship Canal Bridge to two lanes starting at 7 p.m. nightly, with full closures from Monday, Nov. 30 through Thursday, Dec. 3. Southbound express lanes will reopen at 5 a.m. each morning.

Why it matters

Seattle commuters using I-5 through the Ship Canal Bridge should expect reduced capacity and late-evening closures during the Revive I-5 preservation work. Drainage improvements under the project are the stated reason for the overnight closures.

Northbound express lanes will be reduced to two lanes from 7 p.m. and fully closed at 9 p.m. on Nov. 30 and Dec. 2, or at 11 p.m. on Dec. 1 and Dec. 3. Southbound lanes reopen at 5 a.m. daily, and the stub does not indicate whether the schedule could change.

The players

Washington State Department of Transportation (WSDOT)

WSDOT is the state agency responsible for maintaining and operating Washington's highway system, including Interstate 5 and the Ship Canal Bridge.

The details

Crews are making drainage improvements under the Revive I-5: Ship Canal Bridge Preservation project during the overnight closures. The express lanes will be reduced to two lanes each night before the full closure, which occurs at either 9 p.m. or 11 p.m. depending on the date.

Timeline

  1. Monday, Nov. 30: express lanes fully close at 9 p.m.

  2. Tuesday, Dec. 1: express lanes fully close at 11 p.m.

  3. Wednesday, Dec. 2: express lanes fully close at 9 p.m.

  4. Thursday, Dec. 3: express lanes fully close at 11 p.m.

  5. Southbound express lanes reopen at 5 a.m. each morning

Roadmap

The overnight closures are part of the Revive I-5: Ship Canal Bridge Preservation project, a named WSDOT effort to maintain the bridge carrying one of Seattle's main north-south routes. The drainage work is one phase of that broader preservation program.

Drivers heading north on I-5 through the Ship Canal Bridge should plan for reduced capacity starting at 7 p.m. and full express lane closures by 9 p.m. or 11 p.m. on the listed nights. Commuters may need to adjust evening travel or use alternate routes during the closures.

The takeaway

Plan evening trips on I-5 near the Ship Canal Bridge for lane reductions starting at 7 p.m. through Thursday, Dec. 3. Check the scheduled closure times before leaving for the night.

What happens next

Express lanes are scheduled to reopen southbound at 5 a.m. each morning through Thursday, Dec. 3.

Further reading

Find more on Transportation coverage affecting Seattle drivers.

Source note: This article includes information reported by My Edmonds News.