Seattle Readies South Park for King Tide Flooding
Seattle Public Utilities has built barriers and pumps in South Park ahead of high tides forecast for November 25 to 29.
Updated on Nov. 25, 2026 in Weather and Disaster

Live Poll
Do you trust your local government to protect your neighborhood from flooding?
Seattle Public Utilities has launched an emergency response plan for South Park ahead of king tides expected from Nov. 25 to 29, including sandbags for residents and a mile-long wall of sandbags and concrete barriers along the Duwamish River edge. The utility also equipped 22 properties with grinder pumps to prevent sewer backups.
Why it matters
King tides spilled into homes off Chicago and Kenyon between Seventh and Eighth Avenues in December 2022, forcing residents and business owners to discard water-damaged furniture, clothing and belongings. The preparations reflect a lesson from that flooding and the city's effort to limit damage during the coming high-tide window in Seattle.
The figures come from Seattle Public Utilities' own description of its preparations, covering sandbags, pumps and barriers in South Park. Whether the measures will hold during the forecast high tides has not yet been established.
The players
Seattle Public Utilities
The city of Seattle's public utility that manages water, drainage and wastewater services and is running the South Park flood response.
The details
Seattle Public Utilities began outreach to residents and businesses most at risk of flooding, handed out sandbags, and set up a temporary operations base to answer questions and provide shelter and supplies. The utility also monitors weather conditions during high tide events, and a pump station completed in 2023 is expected to reduce right-of-way flooding during many such events.
Timeline
December 2022: King tides flooded South Park homes and businesses.
2023: Drainage infrastructure work in South Park was completed, including a pump station and one and a half miles of new storm drain.
Nov. 25-29: Forecast high tides are expected to bring flood risk to South Park.
Seasonal Patterns
The South Park response builds on the December 2022 king tide flooding, when high tides spilled into homes off Chicago and Kenyon and residents removed water-damaged belongings. Seattle's 2023 drainage work, including a pump station and one and a half miles of new storm drain, is an attempt to prevent a repeat of that event.
South Park residents should check whether their property is among those equipped with grinder pumps and follow Seattle Public Utilities guidance on sandbags and shelter. Residents should also stay alert to weather conditions during the Nov. 25-29 high-tide window.
The takeaway
Flood preparation in South Park relies on a combination of barriers, pumps and drainage work, and the coming high tides will show how well those measures perform. Residents in low-lying areas can benefit from knowing which protections are in place for their property.
What happens next
High tides are forecast for Nov. 25-29, the period when the sandbag wall, barriers and pumps will be tested.
Further reading
Explore more on Safety coverage for Seattle flood preparedness and emergency planning.
Source note: This article includes information reported by KOMO.
Live Poll
Do you trust your local government to protect your neighborhood from flooding?






