Ballard Locks Close for Annual Maintenance

The Army Corps of Engineers is draining the large lock chamber while crews scrape barnacles and repair equipment.

Updated on Nov. 10, 2026 in Openings & Closings

Drained concrete lock chamber with barnacle-streaked walls and a steel gate partly open under overcast Seattle sky.
The U.S. Army Corps of Engineers closed the Ballard Locks in Seattle this week to drain the large chamber for annual maintenance and barnacle removal. AI Illustration. Upload story photo >

The U.S. Army Corps of Engineers has closed the Ballard Locks to drain the large chamber for annual maintenance. Crews are scraping barnacles from lock tunnel walls and repairing the large lock culvert valve.

Why it matters

Barnacles on the lock tunnel walls can harm migrating salmon, which may be cut when they swim against the walls. The closure gives crews access to make repairs that keep the locks operating for the boats and visitors who rely on them in Seattle.

The Ballard Locks handled 27,000 vessels last year and draw about 2 million visitors annually, and the drained chamber stands 55 feet high. The large lock is scheduled to reopen to boat traffic on Nov. 20.

The players

U.S. Army Corps of Engineers

The federal agency that operates and maintains the Ballard Locks and is conducting the annual drainage and repair work.

Ballard Locks (Hiram M. Chittenden Locks)

A pair of navigation locks connecting Salmon Bay with Lake Union, Lake Washington and Puget Sound, and a major Seattle visitor site.

The details

Heavy machinery has been lowered into the chamber as crews replace and repair the large lock culvert valve and fix corrosion-fighting metal rods. The small lock remains open for boat traffic during the closure.

Timeline

  1. The annual closure runs for a couple of weeks in November.

  2. The large lock is slated to reopen on Nov. 20.

Legal Context

The closure follows the Army Corps of Engineers' recurring annual maintenance cycle for the Hiram M. Chittenden Locks, which the agency schedules each November. Regular drainage lets crews address barnacle buildup and corrosion that accumulate between closures.

Boaters heading through the Ballard Locks should plan around the large lock closure, since the small lock remains open for traffic. Visitors planning a trip to the site should expect the large lock to be unavailable until its scheduled Nov. 20 reopening.

The takeaway

Check the schedule before traveling through Seattle's Ballard Locks in November, since the large lock is out of service for maintenance until Nov. 20. The small lock remains available for vessels during the closure.

What happens next

The large lock is scheduled to reopen to boat traffic on Nov. 20.

Further reading

For other facility shutdowns and reopenings across the city, browse Openings & Closings in Seattle.

Source note: This article includes information reported by KOMO.