Sound Transit Returns Upgraded Light Rail Cars
The first four of 62 Series 1 vehicles rejoined Link light rail service after an electronics overhaul by Woojin IS America.
Updated on Nov. 26, 2026 in Transportation

Live Poll
Do you think your local light rail service is getting better or worse?
Sound Transit returned the first four of its 62 Series 1 light rail vehicles to Link service on November 25, 2026, after they received an electronics upgrade. The remaining 58 vehicles are to be upgraded in batches over the next three years.
Why it matters
Several onboard communications subsystems had begun to show degraded performance, and some components were obsolete and no longer supported by the original equipment manufacturer. Sound Transit says the work prepares the Series 1 fleet for its next 15 years of service in the Washington transit network.
The upgrade contract with Woojin IS America carries a base amount of $31,844,776 plus a 13% contingency of $4,104,560, for a total capped value of $35,949,336 before estimated taxes of $3,684,807. Because upgraded vehicles are not compatible with unmodified Series 1 cars, only a limited number of trainsets can run until more of the 62-vehicle fleet is converted.
The players
Sound Transit
Sound Transit is the regional transit agency that operates Link light rail and other bus and rail services across the Puget Sound area of Washington.
Woojin IS America, Inc.
Woojin IS America, Inc. is the contractor selected by Sound Transit to upgrade the electronic systems on the Series 1 light rail vehicles and provide maintenance services.
The details
Sound Transit contracted Woojin IS America, Inc. to upgrade the electronic systems on the Series 1 light rail vehicles and provide maintenance services. The E-Suite package adds new communications equipment, graphical onboard signs, door-light indicators, upgraded CCTV cameras, improved public address speakers, and automated people counters above the doors on all 62 cars. On November 25, cars 110 and 113 made a round trip between Redmond and Lynnwood on the 2 Line.
Timeline
2005: Design of the 62 Kinkisharyo vehicles began.
2009: The Series 1 vehicles entered service.
2022: The Rider Experience and Operations Committee approved the upgrade program.
March 28, 2024: The board approved Motion M2024-14, adding 10 Siemens S700 vehicles.
November 25, 2026: The first four upgraded Series 1 cars rejoined Link light rail service.
Roadmap
The Series 1 upgrade extends the service life of vehicles designed under the 2005 Kinkisharyo program, which entered service in 2009, rather than replacing them outright. The move comes as Sound Transit issued its request for proposals for Series 3 vehicles on June 26, 2026, with those costs expected to exceed the financial plan.
Riders on Link light rail should see upgraded onboard signs, communications, and public address systems as more Series 1 cars return to service over the coming years. Because upgraded vehicles cannot run alongside unmodified Series 1 cars, the number of trains with the new equipment will grow gradually rather than all at once.
The takeaway
Upgrading existing vehicles can extend a fleet's useful life by 15 years when components are obsolete, but riders should expect a phased rollout while the older cars are converted in batches.
What happens next
The remaining 58 Series 1 vehicles are to be upgraded in batches over the next three years.
Further reading
For more on regional rail and transit projects, explore Transportation coverage across Washington.
Source note: This article includes information reported by Railway Supply.
Live Poll
Do you think your local light rail service is getting better or worse?






