Virginia Beach Council Closes Section of Twin Mills Road

The 11-0 vote restricts vehicle traffic near Amazon's fulfillment center, with two gates planned to block access.

Updated on Nov. 19, 2026 in Politics

Isometric editorial illustration of a steel gate barrier across an empty road beside a long, low warehouse block, with a parked truck cab stopped at the closure.
The Virginia Beach City Council voted 11-0 to close a section of Twin Mills Road near Amazon's fulfillment center to vehicle traffic, except in emergencies. AI Illustration. Upload story photo >

Live Poll

Do you think large companies generally listen to nearby residents' concerns?

The Virginia Beach City Council voted 11-0 to close a section of Twin Mills Road between Lava Beach Lane and London Bridge Road to vehicular traffic, except in emergencies. Two gates will be installed, while bicyclists and pedestrians will still be able to use the closed section.

Why it matters

Residents have raised concerns about tractor trailer traffic and noise tied to the Amazon fulfillment center, which opened in 2025. The road was intended as an alternative entrance to the facility if access from Dam Neck Road was unavailable, and the closure changes how trucks reach the site.

The council voted 11-0 to close the road section, and the police emergency center has logged approximately 800 calls for service tied to Twin Mills Road and Lava Beach Lane since 2025. The city has not yet announced a completion date for the gates or results from Amazon's ongoing traffic study.

The players

Amazon

Amazon is the global e-commerce and logistics company that operates the fulfillment center off Dam Neck Road in Virginia Beach.

Virginia Beach City Council

The Virginia Beach City Council is the elected legislative body that governs the city and approved the road closure and earlier construction funding.

The details

Two gates will be installed on the closed section, which will remain open to bicyclists and pedestrians. Amazon has rerouted trucks, installed signage directing drivers away from Twin Mills Road, added turn restrictions at site exits, and shared traffic data with the city.

Timeline

  1. 2022: Virginia Beach economic development staff secured a deal with Amazon for two buildings off Dam Neck Road.

  2. 2023: The City Council approved $22.5 million for the Twin Mills Road construction project.

  3. 2024: Residents began complaining about truck traffic on Twin Mills Road.

  4. 2025: The fulfillment center opened, and noise and trash complaints increased.

  5. November 17, 2026: The City Council voted 11-0 to close the Twin Mills Road section.

Political Context

The closure follows the council's 2023 approval of $22.5 million for Twin Mills Road construction, which had been intended to support truck access to the Amazon facility. Residents' noise and traffic objections now lead the council to restrict the same route it previously funded.

Drivers who previously used Twin Mills Road to reach the Amazon facility will need to use Dam Neck Road or other routes, and vehicles will be blocked from the closed section except in emergencies. Residents of nearby areas such as the Mayberry subdivision may see reduced truck traffic on Lava Beach Lane once the gates are in place.

The takeaway

The vote shows how a municipal road built to support a major employer can be restricted after residents report sustained traffic and noise impacts. Anyone affected by truck routes near the facility can follow future council meetings for updates on the gates and the traffic study.

What happens next

Two gates will be installed on the closed section of Twin Mills Road, though the extraction gives no date for installation. Amazon's 24-hour traffic study is ongoing, and its results have not been released.

Further reading

For more local decisions, see the City Hall coverage of Virginia Beach council actions.

Source note: This article includes information reported by Daily Press.

Live Poll

Do you think large companies generally listen to nearby residents' concerns?