Virginia Peninsula College Breaks Ground on $45M Building
The 75,000-square-foot Hampton campus facility replaces three 1967 buildings and is expected to open in 2028.
Updated on Nov. 18, 2026 in Lifestyle

Live Poll
Do you support local colleges spending $45 million on new campus buildings?
Virginia Peninsula Community College broke ground last week on a $45 million, 75,000-square-foot building at its Hampton campus. The three-story structure replaces Diggs, Moore and Harrison halls, which were demolished last year.
Why it matters
The project reflects how higher education facilities are being redesigned for flexibility after the COVID-19 pandemic shifted attention toward online and asynchronous learning. Residents of Hampton gain a new community-facing space, including a 250-seat event area.
The three-story building spans 75,000 square feet and houses classrooms, offices, a cybersecurity suite, student collaboration spaces, a 250-seat event space and a chef's kitchen. Its $45 million cost is set against the 1967 structures it replaces, and the funding source has not been detailed.
The players
Virginia Peninsula Community College
A public community college serving the Virginia Peninsula region, which is sponsoring the new building at its Hampton campus.
The details
The new building will include classrooms, offices, a cybersecurity suite, student collaboration spaces, a 250-seat event space and a chef's kitchen. Designs drafted in 2019 were revised over the last four years through a series of meetings to make the space more flexible for current and future students.
Timeline
2019: Designs for the building were drafted.
2025: Diggs, Moore and Harrison halls were demolished.
Week of November 9, 2026: Groundbreaking ceremony held at the Hampton campus.
2028: Building is expected to be completed, in time for the college's 60th anniversary of its first classes.
Industry Dynamics
The redesign responds directly to the post-pandemic move toward online and asynchronous learning that reshaped how higher education is delivered. Rather than building fixed lecture-hall space, the college revised its plans to support flexible instruction for students in the years ahead.
Hampton residents and students will gain a 250-seat event space and a chef's kitchen once the building opens, expected in 2028. Students in the meantime will continue to attend classes at the campus while construction proceeds.
The takeaway
Campus buildings designed around flexibility rather than fixed classroom layouts may become a lasting feature of community college planning. Students and families weighing these schools can expect facilities that accommodate both in-person and online study.
Further reading
For more on how colleges are adapting their campuses, explore Higher Education coverage across Hampton.
Source note: This article includes information reported by WHRO Public Media.
Live Poll
Do you support local colleges spending $45 million on new campus buildings?






