UDOT Closes 2300 West for Lehi Sewer Work

Intersection work at 2100 North begins Friday night and is expected to finish by Monday morning.

Updated on Nov. 11, 2026 in Construction

Wide view of a suburban road intersection with orange barrels blocking one lane, a sewer hatch and gravel patch in front, and a trail under an overpass.
The Utah Department of Transportation closes 2300 West in Lehi from 9 p.m. Friday, Nov. 13, while sewer work continues at 2100 North through Monday morning. AI Illustration. Upload story photo >

The Utah Department of Transportation will close 2300 West between the frontage roads in Lehi starting at 9 p.m. Friday, Nov. 13, while reducing eastbound 2100 North to one lane for sewer work. Crews are finishing sewer work at the intersection that began the previous week.

Why it matters

The closures give crews the time needed to complete the sewer work at one of Lehi's busy intersections. Drivers and trail users should plan around the detours and temporary restrictions during the weekend.

The work is scheduled for roughly 56 hours, from 9 p.m. Friday, Nov. 13 to 5 a.m. Monday, Nov. 16, with eastbound 2100 North reduced to one lane. The schedule is weather dependent, and the source does not state whether any delays are expected.

The details

Traffic on 2300 West will be turned around in both directions at Ashton Boulevard and 3600 West while the road is fully closed between the frontage roads. The Jordan River Trail under 2100 North will temporarily reopen during the weekend closure.

Timeline

  1. Sewer work at the intersection began the week before Nov. 13, 2026.

  2. Friday, Nov. 13, 2026 at 9 p.m.: Intersection work and closures begin.

  3. Monday, Nov. 16, 2026 at 5 a.m.: Intersection work is expected to end.

  4. Monday, Nov. 16, 2026 morning: The Jordan River Trail under 2100 North is set to close again.

Industry Context

Sewer and utility work at signalized intersections like 2100 North and 2300 West often requires full closures on cross streets to keep crews and traffic separated. Projects of this kind are typically scheduled over weekends to limit disruption to commuters.

Drivers heading through 2100 North and 2300 West should expect detours and one-lane eastbound traffic from Friday night through early Monday. Trail users can access the Jordan River Trail under 2100 North only during the weekend window.

The takeaway

Plan alternate routes for the weekend and check for schedule changes before heading out, since the work depends on weather. Using the detour at Ashton Boulevard or 3600 West can help avoid delays near the intersection.

What happens next

Intersection work is scheduled to finish by 5 a.m. Monday, Nov. 16, and the Jordan River Trail is set to close again that morning.

Further reading

For more on similar infrastructure projects, browse Construction coverage on Wisevoter.

Source note: This article includes information reported by KUTV.