Utah Regulators Issue Draft Permit for Uranium Mill

The Utah Division of Waste Management and Radiation Control released draft documents for the Shootaring Canyon Mill.

Updated on Oct. 27, 2026 in Nuclear

Bold flat-color editorial illustration depicting a stylized, large-scale industrial processing vat in an arid desert, representing radioactive material licensing.
Utah regulators have issued draft permits for the Shootaring Canyon Mill, marking a significant step in the facility's uranium and vanadium processing revival. AI Illustration. Upload story photo >

Live Poll

Should the United States prioritize increasing domestic capacity for processing uranium and vanadium ore?

State regulators have issued draft copies of a renewed radioactive materials license and groundwater discharge permit for the Shootaring Canyon Mill in Garfield County. The facility is one of only three licensed conventional uranium mills currently operating in the United States.

Why it matters

This regulatory step supports the company’s efforts to restore domestic uranium and vanadium milling capacity. The mill is intended to serve as a central hub for processing ore from multiple regional project sources.

The draft license authorizes the possession of natural uranium and 11e.(2) byproduct material with an annual production cap of 1,500 tons of yellowcake. This facility aims for a refurbishment throughput capacity of 1,000 tons per day.

The players

Utah Division of Waste Management and Radiation Control

This state regulatory body oversees the management and oversight of radioactive waste and radiation-producing equipment within Utah.

Anfield Energy

The company operates the Shootaring Canyon Mill and is focused on domestic uranium and vanadium production projects.

The details

Anfield Energy is currently managing site preparation and removing legacy equipment, including leach tanks and electrical systems, under its existing license. The site maintains a groundwater monitoring network to ensure compliance with technology standards for process ponds.

Timeline

  1. April 5, 2024: Anfield Resources Holding Corp. submitted an application for license renewal.

  2. October 21, 2026: The Utah Division of Waste Management and Radiation Control provided the draft license and permit.

  3. Late 2026: A 45-day public comment period is expected to commence.

  4. Q2 2027: The company targets the receipt of the renewed license.

  5. Q2 2027: Major refurbishment work is scheduled to begin.

The Big Picture

The restart of this facility marks a significant expansion in the U.S. domestic conventional uranium milling infrastructure, which currently consists of only three licensed sites. This progress shifts the domestic processing capability by restoring a central hub for regional uranium ore sources.

The renewal of this license impacts the regional economy through the restoration of industrial milling capacity in Garfield County. Future operations could influence domestic supply chains for uranium and vanadium by providing a central processing hub for ore.

The takeaway

The move by state regulators signals a path toward revitalizing dormant domestic nuclear fuel supply components. Local stakeholders and residents should prepare for the upcoming public comment phase to engage with the site's environmental and operational plans.

Further reading

Learn more about the latest developments in the Nuclear sector.

Live Poll

Should the United States prioritize increasing domestic capacity for processing uranium and vanadium ore?