Laredo Studies Treated Wastewater for Drinking Supply

The city is exploring the feasibility of recycling wastewater to supplement its sole reliance on the Rio Grande.

Updated on Oct. 16, 2026 in Utilities

Isometric editorial illustration of a cylindrical industrial water filtration vessel positioned near a concrete canal, evoking municipal water infrastructure planning.
Laredo is launching a feasibility study to explore using treated wastewater as a municipal drinking source to augment the Rio Grande supply. AI Illustration. Upload story photo >

Live Poll

Should your local community invest in recycled wastewater projects to address future water shortages?

Laredo is launching a feasibility study to determine if treated wastewater can be safely used as a municipal drinking water source. The project aims to address long-term sustainability as population growth continues to strain the city's current supply from the Rio Grande.

Why it matters

The city faces increasing pressure on its water resources, and this initiative seeks to secure a reliable supply for a growing population. By examining alternative sources, Laredo hopes to mitigate the risks associated with depending exclusively on a single, depleting river source.

The city is evaluating potential sites including a Water and Energy Center to determine feasibility. This effort follows the model of El Paso, which is currently constructing a $295 million wastewater plant.

The players

Henry Cuellar

He is a U.S. Representative who secured the necessary funding for the Laredo feasibility study.

Natural Systems Utilities

This firm is contracted to perform the technical analysis on water treatment sites and costs.

Rio Grande International Study Center

This organization is partnering with the city to oversee the research into water sustainability.

The details

Natural Systems Utilities, in partnership with the Rio Grande International Study Center, will analyze necessary technology, site options, and implementation costs. Funding for this research was secured by Henry Cuellar, and the firm is scheduled to present its findings to the city council upon conclusion.

Timeline

  1. 2028: El Paso’s wastewater treatment plant is scheduled to open.

Market Landscape

Laredo's initiative reflects a broader trend of Southwestern cities investing in water reclamation to ensure municipal stability against climate-driven shortages. This strategy mirrors large-scale projects like El Paso's $295 million plant, signaling a shift toward diversified utility portfolios.

Residents should expect the feasibility study to influence future city utility planning and long-term water rate considerations. The results will determine how the city manages its growth without needing to increase its current draw from the Rio Grande.

The takeaway

Laredo is proactively addressing its water vulnerability by exploring recycling technologies already in use elsewhere. Residents should watch for upcoming council reports that will detail the technical requirements for implementing these advanced water systems.

Further reading

Learn more about local infrastructure and water management by visiting the Laredo Utilities section.

Source note: This article includes information reported by Kgns.

Live Poll

Should your local community invest in recycled wastewater projects to address future water shortages?