Houston Approves Bissonnet Corridor Safety Project
City leaders approved engineering services for a planned redesign of a seven-mile stretch of Bissonnet Street in southwest Houston.
Updated on Nov. 12, 2026 in Construction

Live Poll
Do you think your city's roads are getting safer for drivers and pedestrians?
Houston city leaders approved engineering services for the Bissonnet Corridor Safe Streets Project, which would redesign roadways, sidewalks and bike lanes along a seven-mile stretch of Bissonnet Street in southwest Houston. The project is scheduled for construction from 2028 through 2030.
Why it matters
The corridor between South Dairy Ashford and Hillcroft has the highest fatal crash count among city-owned streets, and Bissonnet is considered one of the city's most dangerous roadways. The project is aimed at improving safety for drivers, cyclists and pedestrians along the corridor.
Bissonnet averages 22 people killed or seriously injured each year, with more than 18 severe crashes per mile across the seven-mile corridor. The total cost of the project and its funding breakdown were not detailed in the available information.
The players
City of Houston
The City of Houston is the municipal government of the nation's fourth-largest city, responsible for the city-owned streets along the Bissonnet corridor.
Houston Police Department
The Houston Police Department is the municipal police agency serving the city, which increased enforcement along Bissonnet in 2024.
The details
The project calls for redesigned roadways, sidewalks and bike lanes, along with additional crosswalks and pedestrian pathways. Recent incidents include a fatal crash near Kirkwood Road and Bissonnet Street last month and a hit-and-run death less than a mile away in September, and in 2024 the Houston Police Department increased enforcement and closed some streets overnight.
Timeline
2024: Houston Police Department increased enforcement and closed some streets overnight along Bissonnet.
September: A woman was killed in a hit-and-run crash less than a mile from Kirkwood Road and Bissonnet Street.
Last month: A man died after crashing into a pole near Kirkwood Road and Bissonnet Street.
2028 through 2030: Scheduled construction of the Bissonnet Corridor Safe Streets Project.
Market Landscape
The approval fits into the city's broader push to redesign its most dangerous streets rather than rely on enforcement alone. The Bissonnet corridor's fatality ranking among city-owned streets makes it a leading candidate for that approach.
Drivers, cyclists and pedestrians who use Bissonnet can expect redesigned roadways, sidewalks and bike lanes, plus additional crosswalks, once construction begins. The changes are intended to reduce crashes along a corridor that sees frequent serious injuries.
The takeaway
Residents who regularly travel Bissonnet should watch for construction notices beginning in 2028 and adjust routes if needed. Drivers can reduce risk now by slowing down and watching for pedestrians and cyclists along the corridor.
What happens next
Engineering work on the Bissonnet Corridor Safe Streets Project is underway ahead of construction scheduled from 2028 through 2030.
Further reading
For related coverage, see Construction news across Houston.
Source note: This article includes information reported by abc13 News.
Live Poll
Do you think your city's roads are getting safer for drivers and pedestrians?










