Dallas Plans Sprayground at Fair Oaks Park
Community input meeting held as the city moves into preliminary design for the proposed water play area.
Updated on Nov. 17, 2026 in Home

Live Poll
Do you think your neighborhood is getting better for families with kids?
Dunaway Associates held a community engagement meeting on Nov. 14 at Vickery Meadow Library about a planned sprayground at Fair Oaks Park. The park does not yet have an official name and remains in the data-gathering and preliminary design stages.
Why it matters
The project would add a water play option for children in the Lake Highlands area, where officials cite roughly 10,000 children as potential users. Residents' input during the design phase will help shape how the facility is configured for different ages and comfort levels.
Fair Oaks Park currently has 15 parking spaces, and extra parking is planned along with a sprayground expected to run from 10 a.m. to 8 p.m. The planned operating hours fall within a typical 90 to 100 day pool season, but no opening date has been established and construction awaits permit approvals.
The players
Dunaway Associates
Dunaway Associates is a planning and engineering firm that led the community engagement meeting and preliminary design work for the Fair Oaks Park sprayground.
City of Dallas
The City of Dallas oversees the permits and safeguards for the Fair Oaks Park project and is responsible for the park's development within the city's parks system.
The details
The proposed sprayground will include a mechanical enclosure, feature piping, gravity drains, a balloon filter basket, a basin, a concrete apron, shaded seating and landscape separation. The project will also include prefabricated restrooms, water fountains and water bottle-filling stations, and Fair Oaks Park was chosen for its mature tree canopy, sloped embankment, security lighting, parking and flat site.
Timeline
Nov. 14, 2026: Community engagement meeting held at Vickery Meadow Library.
April 2027: Construction documents expected to be completed.
June 2027: Construction estimated to begin, pending permit approvals.
Landscape Lens
The Fair Oaks Park plan weighs a single large splash pad with one drain against multiple play pods with independent drainage systems, two competing approaches to water-play park design. The choice between them will determine how the park handles drainage, water intensity levels and overall layout for younger and older children.
Families in the Lake Highlands area may gain a nearby water play option once the sprayground opens, though no opening date has been set. Residents can expect extra parking at the park, which currently has only 15 spaces.
The takeaway
Public input during the preliminary design stage can influence whether the park uses a single splash pad or multiple play pods. Residents who want a say should watch for updates before construction documents are finalized in April 2027.
What happens next
Construction documents are expected to be completed in April 2027, with construction estimated to begin in June 2027 pending permit approvals.
Further reading
For related home and outdoor design context, browse Landscaping coverage on Wisevoter.
Source note: This article includes information reported by Lake Highlands.
Live Poll
Do you think your neighborhood is getting better for families with kids?






