TSMC Files $22.6B Chip Plant Plan for Brazos County
The proposed 3,200-acre semiconductor facility south of College Station would create at least 2,099 direct jobs.
Updated on Nov. 26, 2026 in Semiconductors

Live Poll
Would you support a major chip factory being built in Brazos County?
Taiwan Semiconductor Manufacturing Company filed an application with the Texas Comptroller of Public Accounts for a $22.6 billion semiconductor fabrication facility in Brazos County. The application was filed under the Jobs, Energy, Technology and Innovation (JETI) program and is now being evaluated.
Why it matters
The project would bring leading-edge logic chip production to the College Station area, with electricity supplied by Bryan Texas Utilities and no use of Brazos River water. Its proposed scale places it alongside SpaceX and Tesla's recent Grimes County development as a major industrial investment in the region.
The filing is a state tax incentive application under the JETI program, projecting $22.6 billion in investment and at least 2,099 direct jobs averaging $133,000 per year. Whether the project will be approved, and on what terms, remains undetermined pending review by the comptroller, the governor's office and the school board.
The players
Taiwan Semiconductor Manufacturing Company
TSMC is a Taiwanese contract chipmaker and the world's largest semiconductor foundry, currently constructing a fab campus near Phoenix, Arizona.
SpaceX
SpaceX is the private aerospace manufacturer founded by Elon Musk, which applied with Tesla for a tax deal tied to a proposed Terafab facility in Grimes County.
Tesla
Tesla is the electric vehicle and energy company led by Elon Musk, which joined SpaceX in seeking a Grimes County tax reinvestment zone and abatement for the Terafab project.
The details
TSMC proposes a facility covering approximately 3,200 acres between Wellborn and Koppe Bridge roads, within College Station's extraterritorial jurisdiction and College Station ISD boundaries. The plant would manufacture leading-edge logic chips using 2-nanometer or more advanced process technology.
Timeline
June: SpaceX and Tesla received a tax reinvestment zone, tax abatement and economic development agreement from Grimes County commissioners.
Monday, November 23, 2026: TSMC filed its JETI application with the Texas Comptroller of Public Accounts.
Mid-December 2026: Public hearings on the project could begin.
2027: Construction could begin if the project is approved.
2031: Completion of the facility is projected.
Tech Race
The proposal extends TSMC's U.S. expansion beyond its fab campus under construction near Phoenix, Arizona, into a second domestic site. It places Texas in direct competition with Arizona for advanced chip manufacturing capacity.
If approved, the facility could increase local water and electric availability and possibly lower costs for ratepayers, according to projections. Residents would see the effects through utility planning and the local job market rather than any direct change to consumer products.
The takeaway
Large semiconductor projects like this one are decided through state tax programs and public hearings, so residents can follow the process through those open proceedings as the application moves forward. Watching the hearing schedule is the most direct way to track how the project's water, power and jobs commitments take shape.
What happens next
Public hearings on the project could begin as soon as mid-December 2026, and construction could start in 2027 if the application is approved.
Further reading
For broader context on chip manufacturing investment, explore the Semiconductors section.
Source note: This article includes information reported by Waco Tribune-Herald.
Live Poll
Would you support a major chip factory being built in Brazos County?





