TxDOT Will Begin US 377 Bridge Work October 12
Contractors plan nightly maintenance to improve the Adams Branch bridge surface in Brownwood.
Updated on Oct. 9, 2026 in Car Maintenance

Live Poll
Do you support nightly lane closures if they are necessary to extend bridge life in your area?
Starting October 12, 2026, TxDOT contractors will begin preservation work on the US 377 bridge at Adams Branch in Brownwood. This infrastructure project involves installing overlay material to extend the service life of the bridge.
Why it matters
Regular preservation efforts like bridge surface overlays are essential for maintaining structural integrity and preventing long-term degradation of critical local infrastructure. Extending the lifespan of the Adams Branch crossing ensures continued reliable travel for commuters in the area.
Work crews will operate nightly from 8 PM to 6 AM, Monday through Friday morning. All bridge lanes are scheduled to remain open to traffic during daytime hours throughout the maintenance period.
The players
TxDOT
The Texas Department of Transportation is the state agency responsible for overseeing the maintenance, operation, and planning of the state's public transportation systems and highway infrastructure.
The details
Crews will perform the preservation work by applying new overlay material to the bridge surface. Nightly lane closures will be implemented while work is underway, though traffic is expected to flow normally during the day.
Timeline
Construction work begins on October 12, 2026.
Nightly construction hours are 8 PM to 6 AM.
The initial work week is scheduled to end on October 16, 2026.
Roadmap
This project reflects a broader industry shift toward proactive infrastructure maintenance and life-extension programs for aging highway assets. By prioritizing surface overlays, state agencies move to delay costly full-scale replacements through regular, incremental preservation cycles.
Drivers using the US 377 bridge should plan for potential nighttime traffic delays between 8 PM and 6 AM. Daytime commuters will not experience lane closures, allowing for normal travel schedules throughout the work week.
The takeaway
Nighttime bridge work requires extra caution from motorists driving through construction zones after dark. Plan your late-evening routes to account for possible lane closures to ensure safe and timely arrivals.
Further reading
Find more updates on local transit maintenance at Car Maintenance.
Source note: This article includes information reported by Brownwood News.
Live Poll
Do you support nightly lane closures if they are necessary to extend bridge life in your area?










