Watco Brings Autonomous Railcars to Seadrift Texas
Watco will use Intramotev's TugVolt remote-controlled electric switching units at its Seadrift, Texas facility, its second such site after Wood River, Illinois.
Updated on Nov. 21, 2026 in Industry

Live Poll
Do you trust autonomous railcars to be as safe as crews operating trains?
Watco plans to deploy Intramotev TugVolt autonomous railcars to switch freight cars in Seadrift, Texas, Intramotev announced on November 20, 2026. The announcement did not disclose the number of units or a start date.
Why it matters
The deal extends remote-controlled rail switching to a Texas industrial site, following TugVolt units already in revenue service in Wood River, Illinois. For Texas, it shows how freight operators are testing automated yard work as rail networks look to reduce on-site safety risk.
Watco operates more than 45 railroads across over 7,100 miles of track, and TugVolt units have carried more than 650,000 tons and 9,000 carloads in production. The announcement did not provide the number of units to be deployed at Seadrift or a start date.
The players
Watco
Watco is a North American and Australian rail, transloading, and logistics company that runs more than 45 railroads with over 7,100 miles of track.
Intramotev
Intramotev is a rail technology company that developed the TugVolt autonomous electric switching railcar, with active deployments in Missouri, Illinois, Michigan, and Austria.
The details
At Wood River, a TugVolt unit is an electric switching unit converted from a boxcar and controlled remotely, with a Watco employee standing outside the switching area operating it as it repositions cars. Watco says the arrangement reduces safety risks.
Timeline
September 2025: Intramotev and Watco first announced the Wood River agreement.
September 1, 2021: Watco crews took over Seadrift site work, including 35 miles of track.
November 20, 2026: Intramotev announced the Watco Seadrift agreement.
Roadmap
The Seadrift deployment follows the Wood River launch and extends TugVolt beyond Illinois, with Intramotev also announcing an R.J. Corman agreement for Kentucky in March 2026. Together these moves position remote-controlled switching as a growing segment of freight yard operations.
For shippers and communities near Watco facilities, automated switching may change how freight moves within plants, though the announcement gives no timeline for Seadrift. Watco's stated focus on reduced safety risk is the most concrete practical effect reported so far.
The takeaway
Remote-controlled switching is moving from pilot to multi-site deployment, and Seadrift will be a useful test of how quickly the technology scales across Watco's Texas operations.
Further reading
Explore more on Transportation developments shaping freight rail.
Source note: This article includes information reported by Railway Supply.
Live Poll
Do you trust autonomous railcars to be as safe as crews operating trains?






