Turner Construction Finished Peabody Union Project
The $284.4 million mixed-use development has reached completion along the Cumberland River in Nashville.
Updated on Oct. 14, 2026 in Construction

Turner Construction Co. has completed the Peabody Union project, a 1.2 million sq ft mixed-use development in Nashville. The complex sits on a 5-acre site along the Cumberland River.
Why it matters
The development represents a significant expansion of urban infrastructure in Nashville, utilizing complex construction techniques to manage site-specific challenges. The project was redesigned during development to accommodate a hidden sewer tunnel found beneath the site.
The development covers 1.2 million sq ft and includes a 27-story residential tower alongside a six-story Class A office building. The site features a 2-acre commons area and a four-level underground garage with 1,050 parking spaces.
The players
Turner Construction Co.
Turner Construction Co. is a prominent North American construction services firm that manages complex building projects.
The details
Construction teams navigated an undocumented sewer tunnel discovered 15 ft under the tower footprint, necessitating a redesign of the foundation system. Builders relied on drone inspections, ground-based monitoring, and just-in-time material delivery to complete the 50,000 sq ft retail and restaurant space.
Market Landscape
The project highlights a shift toward high-density mixed-use developments that utilize just-in-time logistics to overcome tight urban site constraints. This approach allows developers to maximize land value along the Cumberland River in a highly competitive Nashville market.
The completion of Peabody Union adds 50,000 sq ft of retail and restaurant space to the Nashville riverfront, providing new options for residents and visitors. Local commuters should note the addition of 1,050 parking spaces intended to serve the new residential and office facilities.
The takeaway
Large-scale urban projects often require significant mid-construction adjustments when unexpected geological or utility features are encountered. Managing these risks through advanced monitoring and logistics is now a standard practice for delivering modern mixed-use developments.
Further reading
For more updates on local developments, visit the Construction section.
Source note: This article includes information reported by Engineering News-Record (ENR) magazine.










