Greenville Opens $4.7M Verdae Pedestrian Bridge
The 1,180-foot bridge carries trail users safely over busy Verdae Boulevard on the Swamp Rabbit Trail.
Updated on Nov. 20, 2026 in Politics

Live Poll
Do you think Greenville should keep spending public money on trails like this?
Greenville opened the Verdae Pedestrian Bridge on November 19, 2026, a 1,180-foot structure that carries pedestrians and cyclists over Verdae Boulevard. The $4.7 million project connects to a 0.7-mile route toward Millennium Boulevard.
Why it matters
The bridge separates trail users from traffic on a road that sees nearly 15,000 vehicles daily, giving Greenville residents a safer crossing on the Green Line. It also adds to the Swamp Rabbit Trail network, which now spans 32 miles.
The bridge cost $4.7 million, funded by $2.25 million from the state, $2.37 million from the city and $100,000 from the Upstate Greenways and Trails Alliance. Verdae Boulevard carries nearly 15,000 vehicles daily, while more than 1,000 pedestrians use the Green Line each day.
The players
City of Greenville
Greenville is the city government that funded and built the bridge, contributing $2.37 million toward its construction.
Upstate Greenways and Trails Alliance
The Upstate Greenways and Trails Alliance is a regional organization that supports greenway and trail development across the Upstate of South Carolina, contributing $100,000 to the bridge.
The details
The bridge replaces a signalized trail crossing the city installed at Verdae Boulevard when the Green Line opened in 2023, because funding for a bridge was unavailable at that time. Construction began in August 2026 and the structure opened on November 19, 2026.
Timeline
2023: The Green Line opened, connecting Cleveland Park to the Clemson University International Center for Automotive Research campus.
August 2026: Construction of the Verdae Pedestrian Bridge began.
November 19, 2026: The Verdae Pedestrian Bridge officially opened.
Political Context
The bridge follows the 2023 Green Line opening, when the city had no funding for a grade-separated crossing at Verdae Boulevard and instead installed a signalized trail crossing. Its completion in 2026 shows how the city later secured a permanent solution for that gap.
Pedestrians and cyclists using the Green Line can now cross Verdae Boulevard on an elevated bridge rather than at a signalized trail crossing. Residents who travel the corridor on foot or by bike gain a crossing that separates them from roughly 15,000 vehicles daily.
The takeaway
A grade-separated crossing over a busy arterial road removes the need for trail users to wait at signals, and Greenville's bridge shows that such projects can be completed years after a trail opens when state, city and nonprofit funding are combined.
Further reading
For more on how city decisions shape local projects, see City Hall coverage of Greenville.
Source note: This article includes information reported by The Greenville News.
Live Poll
Do you think Greenville should keep spending public money on trails like this?






