Charleston Secures $100K for Brockman Drive Drainage
State funding will pay for roadside ditches and pipes to ease years of flooding on James Island's Brockman Drive.
Updated on Nov. 18, 2026 in Home Renovation

Live Poll
Do you think flooding problems in your area are getting better?
The City of Charleston has secured $100,000 in state funding from South Carolina for drainage improvements along Brockman Drive. The city approved a disbursement request to receive the fiscal year 2027 appropriation from the South Carolina Department of Environmental Services.
Why it matters
Residents along Brockman Drive have dealt with flooding for years, as water from the street has pooled on their properties and made its way under structures. The project targets the drainage setup that sends stormwater sheeting off the road onto front yards.
The project is funded by a $100,000 fiscal year 2027 state appropriation, and the drainage system is designed for a storm with a 1-in-25 annual chance of occurring. Total project cost beyond the state funding was not stated in the source.
The players
City of Charleston
The City of Charleston is the municipal government of South Carolina's historic coastal city, which spends about $2 million a year on projects like this one.
South Carolina Department of Environmental Services
The South Carolina Department of Environmental Services is the state agency that administers environmental programs and issued the fiscal year 2027 appropriation for this project.
The details
The project adds roadside ditches and pipes, including culverts under driveways, carrying water to an existing outfall pipe. The drainage design accounts for sea level rise, and the next steps are survey and design work.
Timeline
Decades ago: Brockman Drive was cut with a ditch on only one side.
Fiscal year 2027: State appropriation funds the Brockman Drive project.
Mid-to-late 2027: City targets completion of the drainage project.
Roadmap
The project shows how coastal South Carolina municipalities are using state appropriations to retrofit older roads built without adequate drainage. Designing for a 1-in-25 storm and accounting for sea level rise reflects the planning standard now applied to such upgrades.
Homeowners on Brockman Drive may see the flooding that has pooled on their properties reduced once roadside ditches and culverts under driveways are installed. The project's timeline runs through survey, design and construction ahead of a targeted mid-to-late 2027 finish.
The takeaway
Older roads built with one-sided ditches can flood neighboring properties for years, and retrofitting them with proper drainage is the practical fix. Residents on affected streets should watch for survey and design updates as the project moves forward.
What happens next
The next steps are survey and design work, with the city targeting completion of the project by mid-to-late 2027.
Further reading
For more on home-related infrastructure work, see Home Renovation coverage in Charleston.
Source note: This article includes information reported by Live5news.
Live Poll
Do you think flooding problems in your area are getting better?










