Hanwha Philly Shipyard Cuts Steel for Tankers

The Philadelphia yard began building the first of four MR product and chemical tankers for Hanwha Shipping.

Updated on Nov. 17, 2026 in Construction

Sparks fly from a plasma torch cutting grey steel plate in an industrial shipyard, with a gantry crane and river visible in the background.
Hanwha Philly Shipyard held a steel-cutting ceremony on November 17 for the first of four tankers ordered by Hanwha Shipping. AI Illustration. Upload story photo >

Hanwha Philly Shipyard held a steel-cutting ceremony on November 17 for the first of four MR product and chemical tankers ordered by Hanwha Shipping. The shipyard follows Hanwha Defense USA's acquisition of a 60% interest in the facility at the end of October.

Why it matters

The program adds a multi-vessel commercial order to a Philadelphia shipyard now under new majority-linked ownership. Its Jones Act-compliant design keeps the work tied to U.S. domestic maritime trade.

Each tanker is designed to carry 49,500 dwt, and the optional Type II configuration offers 18 segregations for cargo. The contract value for the four-ship order was not disclosed.

The players

Hanwha Shipping

Hanwha Shipping is a South Korean shipping company that ordered the four MR tankers built at Hanwha Philly Shipyard.

Hanwha Defense USA

Hanwha Defense USA is the U.S. defense arm of South Korea's Hanwha Group that acquired a majority stake in Philly Shipyard.

TOTE Services

TOTE Services is a U.S. maritime logistics company that selected Hanwha Defense USA as the first shipbuilder for the Medium Landing Ship program.

The details

The tankers are designed to carry crude oil, refined petroleum products, and chemicals, and to comply with the Jones Act and meet IMO Type 2 and Type 3 standards. Hanwha Defense USA acquired its 60% interest in the shipyard at the end of October.

Timeline

  1. End of October 2026: Hanwha Defense USA acquires a 60% interest in Hanwha Philly Shipyard.

  2. November 17, 2026: Steel is cut for the first MR tanker at a ceremony at the shipyard.

  3. 2029: First MR tanker is scheduled for delivery.

  4. 2030: Fourth and final MR tanker is scheduled for delivery.

Market Landscape

The order keeps U.S. domestic shipping capacity tied to Jones Act requirements that restrict coastwise trade to U.S.-built vessels. The Philadelphia yard's new ownership structure and its Medium Landing Ship award position it as a shipbuilder for both commercial and defense work.

For Philadelphia residents, the project means sustained shipyard employment and work over several years. For shipping customers, the tankers add Jones Act-compliant capacity for domestic crude, refined product, and chemical movements.

The takeaway

Domestic shipbuilding projects like this one depend on long delivery timelines, so their economic effects in Philadelphia will unfold over the rest of this decade rather than all at once.

What happens next

The first MR tanker is scheduled for delivery in 2029, with the fourth and final tanker following in 2030.

Further reading

Explore more Philadelphia construction coverage for the local shipbuilding and infrastructure backdrop.