Eugene Drivers Will Face Broadway Traffic for Move-In
The University of Oregon freshmen move-in days on September 24 and 25 will lead to heavy traffic on Broadway Street.
Updated on Sept. 21, 2026 in Asthma

Live Poll
Do you believe road changes designed to slow traffic improve driving conditions in your community?
University of Oregon officials have asked drivers to avoid Broadway Street during the upcoming freshmen move-in period on September 24 and 25, 2026. A ongoing road renovation project has currently reduced traffic capacity in the area.
Why it matters
The lane closures and increased volume from move-in events are expected to cause heavy traffic delays for local residents. University officials are proactively sharing navigation guidance to mitigate potential gridlock during the transition.
A current road renovation project on Broadway Street has reduced capacity by closing one of three southbound to eastbound lanes. Renovations include a new traffic light near the 515 apartment complex and a raised crosswalk at Patterson Street.
The players
University of Oregon
This is a public research university located in Eugene that is managing the logistics for its annual student move-in event.
The details
The city is adding vegetation and solar-powered bollard barriers as part of a renovation designed to slow traffic and increase driver awareness. Motorists are advised to utilize Interstate 5 exits 191 and 192 as alternatives during the move-in process.
Timeline
September 24, 2026: University of Oregon freshmen move-in days begin.
September 25, 2026: University of Oregon freshmen move-in days end.
Deeper Dive
The Broadway Street renovation project follows the principles of traffic calming and pedestrian safety documented in the National Association of City Transportation Officials' Urban Street Design Guide. The addition of raised crosswalks and bollards represents a broader shift toward prioritizing pedestrian safety in university cities.
Residents should anticipate heavy congestion and are encouraged to plan alternative routes or allow extra travel time during the two-day move-in window. Using Interstate 5 exits 191 and 192 can help drivers bypass the primary construction zone on Broadway Street.
The takeaway
Proactive planning is essential for navigating local construction zones during high-volume events like student move-ins. Checking official traffic resources before departing can save significant time and prevent unnecessary delays.
Further reading
For more information on local health initiatives and city planning, visit the Asthma section.
More information
Check the Oregon Trip Check traffic updates for real-time information on Broadway Street closures.
Live Poll
Do you believe road changes designed to slow traffic improve driving conditions in your community?










