Central Library Earns LEED Platinum Certification

The Bend library joins only one other Central Oregon public building with the top green-building rating.

Updated on Nov. 19, 2026 in Government

Isometric editorial illustration of stacked pale timber blocks beside a flat dark solar panel field on a matte surface, representing a net-zero energy public building.
Bend's Central Library earned LEED Platinum certification, joining the Redmond Library as the only two public buildings in Central Oregon with the top green-building rating. AI Illustration. Upload story photo >

Bend's Central Library has received LEED Platinum certification, the highest green-building rating from the U.S. Green Building Council. The 103,000-square-foot building operates as a net-zero energy facility powered by 47,000 square feet of on-site solar panels.

Why it matters

The certification places the Central Library alongside the Redmond Library as the only two public buildings in Central Oregon with LEED Platinum status. It reflects the energy design goals set out for the building, which was built to operate as a net-zero energy facility.

The solar array covers 47,000 square feet and generates 1.11 GWh of energy annually for a 103,000-square-foot building. Annual performance data since the building opened has not been reported.

The players

Deschutes Public Library

Deschutes Public Library operates the Central Library and Redmond Library, both of which hold LEED Platinum certification.

Cascades East Association of Realtors

The Cascades East Association of Realtors is a regional real estate trade group that presents the Building a Better Oregon Awards.

The details

The library uses no fossil fuels and is designated Net Zero Carbon. Its Dowel-Laminated Timber, a glue-free wood product made of oak, pine and fir sourced from Canada, was combined with wood from sustainably managed forests to meet certification requirements.

Timeline

  1. November 2020: Deschutes County voters approved the bond measure funding new and updated libraries.

  2. May 2024 to May 2026: Construction of the Central Library took place over 24 months.

  3. May 11, 2026: The Central Library opened to the public.

  4. 2026: The library received a Building a Better Oregon Award from the Cascades East Association of Realtors.

  5. Summer 2027: The Downtown Bend Library remodel is scheduled to open.

Political Context

The library was built with funding from the 2020 Deschutes County bond measure, which voters approved to fund new and updated libraries across the county. The project is one of several library projects in the county funded through that vote.

Bend residents can use a public library built to net-zero energy standards with on-site solar generation. The building's green design reflects the use of voter-approved bond funds for county library projects.

The takeaway

Public buildings funded by voter-approved bonds can meet top green-building standards while also serving as local civic spaces. The Central Library shows how energy design decisions made during construction carry through to a building's long-term operations.

What happens next

The Downtown Bend Library remodel is scheduled to open in summer 2027.

Further reading

Explore more Government coverage tied to public building projects in Bend.

Source note: This article includes information reported by Cascade Business News.