Google Secures Oregon Geothermal Power in $500M Deal
The agreement with Quaise Energy would supply 50 megawatts from a central Oregon project designed to reach super-hot rock three miles underground.
Updated on Nov. 21, 2026 in Science

Live Poll
Do you expect your household electricity costs to go up over the next few years?
Google agreed to pay more than $500 million for 50 megawatts of power from a Quaise Energy project in central Oregon. The project is designed to reach temperatures three miles underground, tapping super-hot rock for geothermal energy.
Why it matters
Drilling accounts for roughly a quarter to a third of a geothermal plant's total costs, so new drilling methods could affect whether deep geothermal power becomes commercially viable. The deal signals growing corporate demand for geothermal electricity in Oregon and across the United States.
Google will pay more than $500 million to secure 50 megawatts from the project, and a single super-hot rock well can generate 15 megawatts or more. The source does not establish whether these figures hold at commercial scale, and the timeline for delivering the power is not specified.
The players
Alphabet's technology company, which has invested in and been an early customer of geothermal firm Fervo Energy.
Quaise Energy
A geothermal company developing a gyrotron-based drilling system to reach super-hot rock at depths of several miles.
Mazama Energy
A drilling technology firm that has developed the Carbon Chill method, using carbon dioxide in place of water-based drilling mud.
XGS Energy
A company that received a Department of Energy grant to develop materials, well designs, and models for super-hot rock geothermal depths.
The details
Quaise Energy's system uses a gyrotron to bombard rock with millimeter-wave radiation, vaporizing it into ash at depths beyond 2.5 miles. Mazama Energy's Carbon Chill technology replaces water-based drilling mud with carbon dioxide, which expands and rapidly cools through a valve to absorb heat while carrying rock cuttings to the surface for reuse.
Timeline
Tuesday, week of November 21, 2026: Quaise Energy announced Google's $500 million power commitment.
Last week, before November 21, 2026: The Department of Energy awarded a grant to XGS Energy to develop materials, well designs, and models for super-hot rock depths.
Earlier in 2026: Fervo Energy, in which Google was an investor and early customer, went public.
The Big Picture
Mazama's Carbon Chill technology departs from the conventional water-based drilling mud used in geothermal and oil well drilling, substituting carbon dioxide to cool the drill and speed the work. The shift could reshape how geothermal developers approach the costliest phase of building a plant.
Geothermal power from projects like this could eventually add to Oregon's electricity supply, but the source does not indicate when customers would receive it. Faster, cheaper drilling would be the main factor determining whether such power reaches the grid at a competitive price.
The takeaway
Drilling cost is a central obstacle for deep geothermal, so advances in how wells are cut and cooled may determine how quickly this energy source scales. Readers tracking energy costs should watch whether the technology proves consistent output beyond early demonstrations.
Further reading
Explore more Oregon energy coverage for context on the state's power projects.
Source note: This article includes information reported by ABC Nepal TV.
Live Poll
Do you expect your household electricity costs to go up over the next few years?






