Brooklyn Musician Released Viral Song on BQE Traffic

A viral track highlights ongoing congestion at the Brooklyn-Queens Expressway's Exit 31.

Updated on Sept. 30, 2026 in Hip-Hop and Rap

Screen-print poster illustration of a concrete highway ramp and steel safety barriers, evoking urban traffic congestion in Brooklyn.
A Brooklyn musician's new track draws attention to persistent traffic bottlenecks at the Brooklyn-Queens Expressway's Exit 31. AI Illustration. Upload story photo >

Live Poll

Do you trust your local government to complete planned infrastructure improvements in your area on time?

A Brooklyn resident released a song and music video criticizing the chronic traffic bottlenecks at Exit 31 on the Brooklyn-Queens Expressway. The track brings renewed focus to the congestion issues that frequently affect commuters across the borough.

Why it matters

The song underscores the frustration felt by commuters dealing with daily traffic delays caused by the problematic merging configuration of the exit ramp. This artistic expression coincides with ongoing efforts by transportation authorities to redesign the area.

The Brooklyn-Queens Expressway Exit 31 serves as the primary focal point of the artist's critique, with traffic flow currently obstructed by a bottleneck where the off-ramp merges with a local road at a traffic signal.

The players

Andrew Rose Gregory

The Brooklyn resident and musician released a viral song and video regarding the traffic congestion at Exit 31.

New York State Department of Transportation

The state agency is developing a construction project to modify the ramp and optimize traffic signals to improve flow.

The details

The current layout at Exit 31 forces an off-ramp merge directly onto a local street, resulting in significant vehicle backups. The New York State Department of Transportation has proposed a redesign that involves widening the exit lane and adding a physical barrier between the ramp and Williamsburg Street West.

Timeline

  1. 2010: The Gregory Brothers released their Auto-Tune the News series.

  2. 2025: A community board meeting was held to discuss proposed traffic improvements.

  3. 2028-2029: The traffic improvement construction project is expected to be completed.

Industry Dynamics

This viral release continues a trend of using internet-native musical formats to amplify local political and infrastructure grievances. It mirrors the cultural impact of The Gregory Brothers, who established the efficacy of using catchy, synthesized audio to reach broad audiences.

Commuters navigating Exit 31 can anticipate a potentially long wait for physical relief, as construction is not expected to conclude for several years. For now, the song serves as a cultural outlet for the frustrations experienced by daily drivers in the area.

The takeaway

Using viral music to spotlight municipal planning failures can effectively raise public awareness during long project lead times. Residents may find that such artistic pressure maintains visibility on critical infrastructure needs until scheduled upgrades finally begin.

What happens next

The New York State Department of Transportation intends to provide an official update on the construction project timeline soon.

Further reading

Explore the intersection of local culture and music in the New York City Hip-Hop and Rap section.

Source note: This article includes information reported by ABC7 New York.

Live Poll

Do you trust your local government to complete planned infrastructure improvements in your area on time?