LG Energy Solution Showcases AI Data Center Power at RE+

The company is presenting integrated power infrastructure for AI data centers at North America's largest renewable energy exhibition in Las Vegas.

Updated on Nov. 17, 2026 in Electric Vehicles

Isometric editorial illustration of a row of matte battery storage cabinets linked by cable to a UPS unit, reflecting data-center backup power.
LG Energy Solution is showcasing integrated battery power infrastructure for AI data centers at RE+ 2026 in Las Vegas, running November 17-19. AI Illustration. Upload story photo >

LG Energy Solution is showcasing integrated power infrastructure for AI data centers at RE+ 2026, held November 17-19 at the Las Vegas Convention Center. The company's exhibition spans five zones and features battery energy storage systems, a UPS battery solution, and energy management systems.

Why it matters

Demand for reliable backup and storage power is rising as AI data centers expand across North America, and the company's plan to secure more than 50 GWh of energy storage production capacity in the region by the end of 2026 signals how seriously it is pursuing that market.

The JF3 LINK system, built with U.S.-manufactured LFP batteries, improves site-level energy density by approximately 26% over conventional systems. AEROS Intelligence can help customers defer battery augmentation for around 1.5 years.

The players

LG Energy Solution

A South Korean battery maker and a major global supplier of lithium-ion batteries for electric vehicles and energy storage systems.

RE+ (Renewable Energy Exhibition)

North America's largest renewable energy exhibition, which draws industry buyers, developers and suppliers each year.

The details

The exhibition pairs battery energy storage with a UPS battery solution, battery backup units, and energy management systems as integrated AIDC power infrastructure. The company also showcased SIB LINK sodium-ion batteries combined with solid-state transformer technology as a next-generation concept, and its JF2 AC LINK has qualified as an NVIDIA DSX Ready BESS.

Timeline

  1. November 17-19, 2026: RE+ 2026 exhibition at the Las Vegas Convention Center

  2. End of 2026: target to secure more than 50 GWh of ESS capacity in North America

Roadmap

Battery storage makers are increasingly tailoring products to AI data center power needs, and LG Energy Solution's NVIDIA DSX Ready qualification places its JF2 AC LINK within that emerging category. The company's push to add more than 50 GWh of North American storage capacity reflects a broader race to supply domestic energy storage as data center demand grows.

Data center operators evaluating backup and storage power can compare integrated systems like the JF3 LINK, which offers a 26% gain in energy density and U.S.-made LFP batteries. Customers considering AEROS Intelligence could defer battery augmentation for about 1.5 years, which affects long-term capital planning.

The takeaway

Power infrastructure is becoming a core part of AI data center planning, so buyers comparing storage systems should weigh energy density, domestic manufacturing and augmentation timelines together. Products that defer costly battery upgrades can meaningfully change total ownership costs.

Further reading

For more on the battery technology behind this showcase, explore Electric Vehicles coverage.

Source note: This article includes information reported by The Manila times.