Ebenezer Church Road Closes for Bridge Repairs
NCDOT is closing a section of Ebenezer Church Road in Raleigh from Monday, November 30, through Friday, December 4, for bridge deck work.
Updated on Nov. 25, 2026 in Industry

The N.C. Department of Transportation will close a section of Ebenezer Church Road in Raleigh starting at 8 a.m. Monday, November 30, while contractors repair the bridge deck over Richland Creek. The closure is scheduled to end at 5 p.m. Friday, December 4.
Why it matters
The closure affects a road that carried an average of about 5,800 drivers a day in 2025, so commuters in Raleigh will need to plan alternate routes for the duration of the work. Access to nearby side streets, subdivisions and the Crabtree Creek West Trail parking area will be maintained.
The road carried an average of about 5,800 drivers a day in 2025, according to NCDOT figures. The closure is scheduled to run from 8 a.m. Monday, November 30, to 5 p.m. Friday, December 4, with no stated contingency for delays.
The players
N.C. Department of Transportation
The state agency responsible for building and maintaining North Carolina's highways, bridges and related transportation infrastructure, including the Ebenezer Church Road bridge.
The details
Contractors for the N.C. Department of Transportation are making repairs to the bridge deck over Richland Creek on Ebenezer Church Road. Drivers are directed to use Duraleigh Road and Glenwood Avenue as a detour around the closed section.
Timeline
8 a.m. Monday, November 30: Road closure begins for bridge deck repairs.
5 p.m. Friday, December 4: Road closure is scheduled to end.
Construction Pattern
This closure follows a pattern of short, scheduled bridge deck repairs on state-maintained roads, in which NCDOT closes one section for a defined window and routes traffic onto nearby arterials. Raleigh drivers have seen similar detours on other maintenance projects, though the extraction does not confirm how this job compares in length or scope to earlier ones.
Drivers who normally use Ebenezer Church Road should plan to use Duraleigh Road and Glenwood Avenue for the full closure window. Residents of side streets and subdivisions on either side of the bridge can still reach their homes, and visitors to the Crabtree Creek West Trail parking area can still access it from the north.
The takeaway
Plan for a five-day detour if you regularly drive Ebenezer Church Road. Allow extra time on Duraleigh Road and Glenwood Avenue during the closure, which runs from Monday, November 30, through Friday, December 4.
What happens next
The road is scheduled to reopen after 5 p.m. Friday, December 4, once the bridge deck repairs are complete.
Further reading
For more on local building and infrastructure work, browse Construction coverage for Raleigh.
Source note: This article includes information reported by Durham Herald Sun.





