Fifth Street Closes Overnight for Water Line Work
NCDOT closes a section of Fifth St. west of Memorial Dr. starting November 20, with detours in place.
Updated on Nov. 19, 2026 in Business

The North Carolina Department of Transportation will close a section of Fifth St. west of Memorial Dr. beginning at 6:00 pm on November 20, 2026, for a water line installation. Drivers will be detoured via Moye Boulevard, Stantonsburg Road and Memorial Drive, while access to local residences and businesses is maintained.
Why it matters
The closure affects drivers and commuters moving through the Greenville area, who will need to plan alternate routes during the work. Access for nearby residents and businesses will remain open throughout the closure.
The closure is scheduled to run from 6:00 pm on November 20, 2026 until 6:30 am on November 23, 2026, weather permitting. The notice does not specify how many lane closures will occur or when they will fall during the paving work.
The players
North Carolina Department of Transportation
The state agency responsible for building, maintaining and operating North Carolina's highways, bridges and related transportation infrastructure.
The details
NCDOT is closing Fifth St. west of its intersection with Memorial Dr. to install a water line. Intermittent lane closures will also be used to complete paving operations in the area, and access to local residences and businesses will be maintained during the closure.
Timeline
6:00 pm on November 20, 2026: Closure of Fifth St. west of Memorial Dr. begins.
6:30 am on November 23, 2026: Fifth St. is scheduled to reopen to traffic, weather permitting.
Roadmap
Closures like this one follow a familiar pattern in which NCDOT pairs underground utility work with posted detours and staged lane restrictions on Greenville's local roads. The Fifth Street project fits that routine rather than marking a change in how the agency handles right-of-way work.
Drivers who normally use Fifth St. west of Memorial Dr. should plan to use Moye Boulevard, Stantonsburg Road or Memorial Drive while the closure is in effect. Residents and businesses on the closed section will still have access during the work.
The takeaway
Drivers heading west on Fifth St. should build in extra time or pick a detour before the closure begins at 6:00 pm on November 20. Checking conditions before the reopening window on November 23 can help avoid delays if weather pushes the schedule back.
What happens next
Fifth St. is scheduled to reopen to traffic by 6:30 am on November 23, 2026, weather permitting.
Further reading
For more on local infrastructure work, see Utilities coverage for Greenville.
Source note: This article includes information reported by WNCT Channel 9 Greenville/New Bern.





