Eno River State Park Reopens 30.7 Miles of Trails

Most of the park's trail network is open again more than a year after Tropical Storm Chantal, while several bridges remain closed.

Updated on Nov. 27, 2026 in National Parks

Wooden footbridge crossing a shallow river over grey rocks, with red clay banks and autumn forest beyond, in soft afternoon light.
Eno River State Park has reopened 30.7 miles of its trails more than a year after Tropical Storm Chantal, but the Cox Mountain suspension bridge remains closed while repairs are designed and bid. AI Illustration. Upload story photo >

Live Poll

Do you think your community's public infrastructure is getting better after recent storms?

Eno River State Park has reopened 30.7 miles of 26 trails following damage from Tropical Storm Chantal, which pushed the river to a record flood height. Roughly 10.4 miles of trail remain closed, mostly because of damaged bridges.

Why it matters

Visitors to the park in Durham and Orange counties can use most of its trail system again, but the Cox Mountain trail and other routes stay closed until bridge repairs are complete. Bridge work has to clear cost estimates, permitting and environmental planning before construction can begin, which is why reopening is taking longer than other repairs.

Park staff have reopened 30.7 miles of 26 trails, while 10.4 miles remain closed, mostly due to bridge damage. Debris piles from the storm also remain in the park, and no reopening date has been set for the Cox Mountain trail.

The players

Eno River State Park

A North Carolina state park along the Eno River managed by the state parks system, known for its extensive network of hiking trails and river access.

The details

The suspension bridge leading to the Cox Mountain trail is closed, which also keeps the trail across the river closed. As of late November, the suspension bridge and the Bobbitt's Hole bridge had completed design and were out to bid for external contractors. Parks staff are also fixing the grade of the emergency vehicle ford at Fews Ford so first responders can reach emergency situations, and they have planted native oats to shore up the riverbank.

Timeline

  1. Tropical Storm Chantal struck about 16 months before November 2026, breaking the Eno River's flood-height record.

  2. The last closed access on Cole Mill reopened on a Wednesday before November 27, 2026.

  3. In late November 2026, the suspension and Bobbitt's Hole bridges were put out to bid.

Seasonal Patterns

Tropical Storm Chantal's record flood height on the Eno River stands out against the river's typical seasonal rise, which is usually tied to spring rains and summer storms. Its lasting trail closures show how a single extreme event can outlast the normal seasonal cycle of park recovery.

Visitors heading to Eno River State Park should check which trails are open before going, because the Cox Mountain trail and routes that depend on the closed suspension bridge remain off-limits. Expect the closed sections to stay closed until contractors finish bridge repairs, and plan hikes on the reopened 30.7 miles of trail instead.

The takeaway

Bridge repairs in public parks can take far longer than trail reopenings, so visitors should plan around closed crossings rather than assuming a full park is available. Checking current trail status before a visit saves time and avoids disappointment.

Further reading

For more on how other park systems handle storm recovery, browse National Parks coverage across North Carolina.

Source note: This article includes information reported by WRAL.

Live Poll

Do you think your community's public infrastructure is getting better after recent storms?