Helena Flats School Raises $100K for New Playground

The school's nearly 40-year-old playground is being replaced, with fundraising aimed at a March 2027 target.

Updated on Nov. 21, 2026 in Civic Engagement

Weathered metal jungle gym with chipped paint and exposed rusted steel, beside a newly built wheelchair-accessible timber ramp over a wood-chip ground.
Helena Flats School is raising $100,000 to replace its playground, in use since 1988, with two new jungle gym structures and a wheelchair-accessible ramp. AI Illustration. Upload story photo >

Live Poll

Do you think your local schools' playgrounds and facilities are kept up well enough?

Helena Flats School is fundraising $100,000 to replace its playground, which has been in use since 1988. Two jungle gym options, including one with a wheelchair-accessible ramp, were presented to the playground committee on Nov. 9.

Why it matters

The existing equipment's paint and rubberized coatings are worn and chipped, exposing the metal underneath, which the school cites as a safety concern. The project is also designed with wheelchair accessibility in mind, and the playground is open to the public after the school day ends.

The school's $100,000 fundraising goal is measured against roughly 300 enrolled students, and a Nov. 7 sponsored fun run drew 96 participants. It is not yet clear how much of the goal has been raised so far or which of the two proposed structures will be selected.

The players

Helena Flats School

A public school in Helena serving pre-kindergarten through eighth grade students, whose playground is being replaced through a community fundraising effort.

The details

The school plans to replace the existing jungle gym with two structures, one for ages 2 through 5 and one for ages 5 through 12, while keeping the swing set and metal geodesic climbing dome and possibly moving the tire swing. The playground committee, made up of about eight administrators, parents, teachers, and a board member, plans to buy the new structures by spring and install them for recess in the fall.

Timeline

  1. 1988: The original playground was installed and first used by children.

  2. Nov. 7: A sponsored fun run drew 96 participants.

  3. Nov. 9: Two jungle gym options were presented to the committee.

  4. March 2027: The school targets reaching its $100,000 fundraising goal.

  5. Spring 2027: The school plans to purchase the new structures.

Civic Engagement Context

Projects like this one rely on parents, teachers, and local donors to close funding gaps for aging school facilities. The Helena Flats effort, with its sponsored fun run and committee structure, reflects that model of local civic participation.

The playground is open to the public after the school day ends, so local families may use the new equipment once it is installed. Residents who want to support the project can contribute through the school's donation page.

The takeaway

Community fundraising can close the gap for aging school facilities, and the Helena Flats project shows how a combination of events, committee work, and donations can move a major replacement forward. Residents interested in the effort can contribute or attend school events to help reach the March 2027 goal.

What happens next

The school plans to reach its $100,000 goal by March 2027, purchase new structures by spring 2027, and begin a second phase of exercise-focused equipment for teens and adults in 2028.

Further reading

For more on local community involvement, see Civic Engagement coverage for Helena.

More information

Donations to the project can be made through the Helena Flats School playground project donation page.

Source note: This article includes information reported by The Daily Inter Lake.

Live Poll

Do you think your local schools' playgrounds and facilities are kept up well enough?