Worcester Tech Welders Build Chute for Snow Hill Football
Welding students at Worcester Technical High School built a 10-by-20-foot football training chute for Snow Hill High School's team.
Updated on Nov. 19, 2026 in Secondary Education

Welding students at Worcester Technical High School built a football chute for the Snow Hill High School football team after the team asked whether the class could make one. The student-built chute is in use as the team advances in the playoffs.
Why it matters
The project gave Snow Hill a training tool at a lower cost than the commercial version sold online, and it shows how a school welding program can serve local athletic programs. It also continues a relationship between Worcester Tech's welding program and area high schools.
The chute has a 10-by-20-foot low-ceiling frame built from one-inch metal tubing and five adjustable legs on swivel wheels. It takes about a month and a half to build and can fit five to seven players for offensive and defensive drills.
The players
Worcester Technical High School
A public vocational high school in Worcester whose welding program built the football chute.
Snow Hill High School
A public high school whose football team requested the chute and continues to use it during its playoff run.
The details
Zion Jenkins, a welding student who also plays for Snow Hill, was the main builder. Students used welding software to design the chute, ordered the materials, fabricated the five legs and installed wheels to make the structure mobile. Work began at the end of the previous school year and the chute was delivered at the start of this school year.
Timeline
End of last school year: Students began work on the football chute.
Beginning of this school year: Students finished the chute and delivered it to Snow Hill High School.
Friday, Nov. 20, 2026: Snow Hill's football team plays Boonsboro in the MPSSAA Class 1A quarterfinals.
Season Trajectory
The chute arrives as Snow Hill advances through the MPSSAA Class 1A playoffs, and its use is tied to the team's postseason preparation. The project also follows Worcester Tech's welding program building a batting cage for Stephen Decatur High School and Snow Hill about a decade ago.
Snow Hill football players can use the chute in offensive and defensive drills during the playoffs. The student-built version gives the team a lower-cost option than buying the commercial model online.
The takeaway
Schools can build practical equipment for local teams through hands-on vocational programs, reducing costs while giving students real-world projects. Projects like this show how classroom skills can directly support student athletes.
Further reading
For more on school programs in the area, see Secondary Education coverage in Worcester.
Source note: This article includes information reported by Berlin, Ocean Pines News Worcester County Bayside Gazette.






