Renderings Show Design for New Brockton High
Newly released designs for a proposed $800 million school show an arced building with many windows and an outdoor plaza.
Updated on Nov. 17, 2026 in Secondary Education

Live Poll
Would you vote yes on a $188 yearly tax increase for a new Brockton High?
Newly released renderings show the design of a proposed new Brockton High School, which voters will decide on in winter or early spring. The $800 million project is being developed with help from Suffolk Construction.
Why it matters
A yes vote would lead to an average property tax increase of $188 per year over 10 years, while the state pays the majority of the project cost. A no vote would end the project.
The proposed building would expand career technical education space to about 73,000 square feet from roughly 24,000 square feet today. Voter approval is still pending, and the decision timing is not yet final.
The players
Suffolk Construction
Suffolk Construction is a large construction firm that is helping develop designs for the project and would oversee construction if voters approve it.
The details
The proposed building is arced with many windows, a limestone first floor, black and red brick on the second and third floors, and metal panels on the fourth. It would include a collaborative trade hall, an e-sports computer lab and a school-based health center, and would keep the current four-house model.
Timeline
Oct. 29, 2026: School building committee presented plans for career technical programming space.
Nov. 12, 2026: Architect described the outdoor plaza at a school building committee meeting.
Winter or early spring 2027: Voters are expected to decide on the $800 million project.
Seasonal Patterns
The project depends on the state paying the majority of its cost, a funding structure common to Massachusetts school construction projects. Local voters still must approve the local share before the district can proceed.
If approved, Brockton residents would see an average property tax increase of $188 per year over 10 years. Students would gain expanded career technical classrooms and new trade, e-sports and health facilities.
The takeaway
Residents weighing the vote should compare the local property tax cost against the expanded career and technical facilities the proposed building would provide.
What happens next
Voters will decide on the $800 million project in winter or early spring 2027.
Further reading
Explore more on Secondary Education coverage in Brockton.
Source note: This article includes information reported by The Enterprise.
Live Poll
Would you vote yes on a $188 yearly tax increase for a new Brockton High?






